The successful application of pioneer pipe-roof protection technology in the Longchishan tunnel

In light of geological conditions,tunnel entrance surrounding conditions and hydrological conditions of Longchishan tunnel,the paper introduces advance large shed-pipe construction technologies,and mainly discusses the shed-pipe construction design parameters,construction procedures and technological quality control points and so on,with a view to accomplish tunnel entrance construction.