A three‐objective user equilibrium model: Time surplus maximisation under uncertainty

In this paper, we propose a user equilibrium model considering the three most important factors influencing route choice behaviour in a road network, namely, travel time, travel time reliability and monetary cost. We further develop the time surplus maximisation bi-objective user equilibrium (TSmaxBUE) model and incorporate the concept of travel time budget to model how users might react to uncertainty induced by day-to-day variability in travel time caused by traffic incidents. This results in a three-objective user equilibrium model, which has a possibly infinite set of equilibrium flows. To compute equilibrium flows, we introduce time budget surplus (TBS) defined as the maximum travel time a user is willing to spend minus the actual time budget required for a desired level of travel time reliability. At equilibrium, for each origin-destination (O-D) pair, all individuals are travelling on the path with the highest TBS value among all the efficient paths between this O-D pair. This becomes a time budget surplus maximisation three-objective user equilibrium model (TBSmaxTUE). We show that the TBSmaxTUE model is a special case of three-objective user equilibrium considering minimisation of expected travel time, travel time variance and toll (monetary cost) as objectives. We illustrate the model and our results on a small network.

[1]  J. Jucker,et al.  An Empirical Study of Travel Time Variability and Travel Choice Behavior , 1982 .

[2]  Hong Kam Lo,et al.  Degradable transport network: Travel time budget of travelers with heterogeneous risk aversion , 2006 .

[3]  Kenneth A. Small,et al.  THE SCHEDULING OF CONSUMER ACTIVITIES: WORK TRIPS , 1982 .

[4]  Robert B. Dial,et al.  Bicriterion Traffic Assignment: Basic Theory and Elementary Algorithms , 1996, Transp. Sci..

[5]  J. Wardrop ROAD PAPER. SOME THEORETICAL ASPECTS OF ROAD TRAFFIC RESEARCH. , 1952 .

[6]  Torbjörn Larsson,et al.  On traffic equilibrium models with a nonlinear time/money relation , 2002 .

[7]  Kenneth A. Small,et al.  Valuing time and reliability: assessing the evidence from road pricing demonstrations , 2003 .

[8]  David Bernstein,et al.  The traffic equilibrium problem with nonadditive path costs , 1995 .

[9]  David M Levinson,et al.  Value of Travel Time Reliability: A Review of Current Evidence , 2010 .

[10]  Philip Wolfe,et al.  An algorithm for quadratic programming , 1956 .

[11]  Dongjoo Park,et al.  Solving the bicriteria traffic equilibrium problem with variable demand and nonlinear path costs , 2010, Appl. Math. Comput..

[12]  R. Jayakrishnan,et al.  A FASTER PATH-BASED ALGORITHM FOR TRAFFIC ASSIGNMENT , 1994 .

[13]  Matthias Ehrgott,et al.  A bi-objective user equilibrium model of travel time reliability in a road network , 2014 .

[14]  F. Leurent Cost versus time equilibrium over a network , 1993 .

[15]  D. Hearn,et al.  Chapter 6 Network equilibrium models and algorithms , 1995 .

[16]  Mohamed Abdel-Aty,et al.  INVESTIGATING EFFECT OF TRAVEL TIME VARIABILITY ON ROUTE CHOICE USING REPEATED-MEASUREMENT STATED PREFERENCE DATA , 1995 .

[17]  C Terence,et al.  The Value of Time and Reliability: Measurement from a Value Pricing Experiment , 2003 .

[18]  Michael Florian Network Equilibrium Models for Analyzing Toll Highways , 2006 .

[19]  D. Hensher,et al.  Willingness to pay for travel time reliability in passenger transport: A review and some new empirical evidence , 2010 .

[20]  Stella C. Dafermos,et al.  Traffic assignment problem for a general network , 1969 .

[21]  Hillel Bar-Gera,et al.  Traffic Assignment by Paired Alternative Segments , 2010 .

[22]  Matthias Ehrgott,et al.  A framework for and empirical study of algorithms for traffic assignment , 2015, Comput. Oper. Res..

[23]  Hong Kam Lo,et al.  Network with degradable links: capacity analysis and design , 2003 .

[24]  Hong Kam Lo,et al.  Traffic equilibrium problem with route-specific costs: formulation and algorithms , 2000 .

[25]  Matthias Ehrgott,et al.  Tolling Analysis with Bi-objective Traffic Assignment , 2008, MCDM.

[26]  Michael Florian,et al.  A New Look at Projected Gradient Method for Equilibrium Assignment , 2009 .

[27]  Mike Smith,et al.  The existence, uniqueness and stability of traffic equilibria , 1979 .

[28]  Henry X. Liu,et al.  Uncovering the contribution of travel time reliability to dynamic route choice using real-time loop data , 2004 .

[29]  M. Ehrgott,et al.  Modelling route choice behaviour in a tolled road network with a time surplus maximisation bi-objective user equilibrium model , 2013 .

[30]  J. G. Wardrop,et al.  Some Theoretical Aspects of Road Traffic Research , 1952 .

[31]  David P. Watling,et al.  User equilibrium traffic network assignment with stochastic travel times and late arrival penalty , 2006, Eur. J. Oper. Res..