Monitoring systems and their effectiveness for project cost control in construction
暂无分享,去创建一个
[1] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[2] Saad H.S. Al-Jibouri,et al. Comparisons of systems for measuring project performance , 2001 .
[3] Harish Chandra,et al. An integrated information system , 1993, J. Inf. Sci..
[4] John A. Farrell,et al. Network Analysis for Planning and Scheduling (3rd Edition) , 1978 .
[5] James E. Kelley,et al. Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).
[6] Ray Wild. Book reviewProject cost control using networks: 2nd edition, Edited by C. Staffurth, Institute of Cost and Management Accountants and Heinemann, London, 118 pp. £5.50 (softback) , 1981 .
[7] David G. Luenberger,et al. State space analysis of control systems , 1967 .
[8] J. Gobourne. Cost control in the construction industry , 1973 .
[9] Martin Barnes. Measurement in contract control : a guide to the financial control of contracts using the Civil Engineering Standard Method of Measurement , 1977 .
[10] 尾形 克彦,et al. State space analysis of control systems , 1967 .
[11] James Gordon,et al. Project Management and Project Network Techniques , 1995 .
[12] Roy Pilcher. Principles of construction management , 1992 .
[13] Frederick Harrison,et al. Advanced Project Management: A Structured Approach , 1992 .