Factors Influencing Building Contractors’ Pricing for Time-Related Risks in Tenders

The contractors’ pricing for contract risks in tenders determines how much the employers have to pay for the risk transfer. Therefore, understanding the factors influencing the contractors’ pricing for contract risks is crucial for employers to optimize the cost effectiveness of risk allocation in contracts. This study investigates the factors that contractors perceive to be important when they are pricing “time-related” contract risks. A questionnaire survey was designed for collecting data from building contractors currently operating in Hong Kong. Contractors were not only required to rate the importance of individual factors, but also to state the cost implications when compared with normal pricing in the absence of the concerned factor. The findings reveal that a single factor may have two-sided implications (both inflating and deflating the prices) for which they can be in unequal scales. These scales vary according to the contractor size and the reasons of the differences are investigated. The find...

[1]  Mohammed Fadhil Dulaimi,et al.  The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore , 2002 .

[2]  A. Shash Factors considered in tendering decisions by top UK contractors , 1993 .

[3]  Ali A. Shash,et al.  The effect of contractor size on mark-up size decision in Saudi Arabia , 1993 .

[4]  Mohammed Wanous,et al.  A neural network bid/no bid model: the case for contractors in Syria , 2003 .

[5]  Tianji Xu,et al.  Risk assessment on contractors' pricing strategies , 2001 .

[6]  Akintola Akintoye,et al.  Analysis of factors influencing project cost estimating practice , 2000 .

[7]  Aminah Robinson Fayek,et al.  COMPETITIVE BIDDING STRATEGY MODEL AND SOFTWARE SYSTEM FOR BID PREPARATION , 1998 .

[8]  Martin Skitmore,et al.  The effect of contract type and size on competitiveness in bidding , 1997 .

[9]  Ali A. Shash,et al.  Factors affecting a contractor's mark-up size decision in Saudi Arabia , 1992 .

[10]  M. Skitmore The construction contract bidder homogeneity assumption: An empirical test , 1991 .

[11]  Mohammed Wanous,et al.  To bid or not to bid: a parametric solution , 2000 .

[12]  Peter E.D. Love,et al.  Combining rule-based expert systems and artificial neural networks for mark-up estimation , 1999 .

[13]  Gary R. Smith,et al.  Small to Medium Contractor Contingency and Assumption of Risk , 1999 .

[14]  D. K. H. Chua,et al.  Key Factors in Bid Reasoning Model , 2000 .

[15]  Simaan M. AbouRizk,et al.  UTILITY-THEORY MODEL FOR BID MARKUP DECISIONS , 1996 .

[16]  Irtishad Ahmad,et al.  Questionnaire Survey on Bidding in Construction , 1988 .