Analysis and Evaluation of Double-Ended Flat-Shunted Yard Performance Employing Two Yard Crews
暂无分享,去创建一个
[1] Marin Marinov,et al. A mesoscopic simulation modelling methodology for analyzing and evaluating freight train operations in a rail network , 2011, Simul. Model. Pract. Theory.
[2] Mark S. Daskin,et al. Queuing Models of Classification and Connection Delay in Railyards , 1982 .
[3] Norbert Adamko,et al. OPTIMISATION OF RAILWAY TERMINAL DESIGN AND OPERATIONS USING VILLON GENERIC SIMULATION MODEL , 2008 .
[4] Marin Marinov,et al. A simulation modelling methodology for evaluating flat-shunted yard operations , 2009, Simul. Model. Pract. Theory.
[5] Marin Marinov. Análise e Avaliação do Desempenho de Gares de Triagem , 2008 .
[6] M Marinov. The Penalty of Cyclic Queues in Operating Processes with Freight Trains at Formation Yards , 2006 .
[7] Jörn Pachl,et al. Railway Operation and Control , 2002 .
[8] Carl D. Martland,et al. PMAKE Analysis: Predicting Rail Yard Time Distributions Using Probabilistic Train Connection Standards , 1982 .
[9] E. R. Petersen. Railyard Modeling: Part II. The Effect of Yard Facilities on Congestion , 1977 .
[10] E. R. Petersen. Railyard Modeling: Part I. Prediction of Put-Through Time , 1977 .
[11] Marin Marinov. Ripple effects in yard operations , 2008 .
[12] A. Alan B. Pritsker,et al. Introduction to simulation and SLAM II , 1979 .