Accelerated bridge construction (ABC) decision making and economic modeling tool.

In this FHWA-sponsored pool funded study, a set of decision making tools, based on the Analytic Hierarchy Process (AHP) was developed. This tool set is prepared for transportation specialists and decision-makers to determine if ABC is more effective than traditional construction for a given bridge replacement or rehabilitation project. The tool set is user-friendly, flexible to accommodate a range of construction situations, transparent as to the method of calculation, and customizable to maintain future relevance. To accommodate this task, a comprehensive literature review on a number of relevant domains such as ABC construction techniques and decision making approaches, were completed. The findings were summarized into a decision model hierarchy that was also incorporated into the decision making software. The software was tested through evaluating a set of real-world construction projects.

[1]  Yong Bai,et al.  Processes and Techniques for Rapid Bridge Replacement after Extreme Events , 2007 .

[2]  Luis G. Vargas,et al.  How to Make A Decision , 2012 .

[3]  James T. O'Connor,et al.  Model for evaluating bridge construction plans , 2001 .

[4]  Evangelos Triantaphyllou,et al.  Multi-criteria Decision Making Methods: A Comparative Study , 2000 .

[5]  Yong Bai,et al.  Rapid Bridge Replacement: Processes, Techniques, and Needs for Improvements , 2006 .

[6]  Mary Lou Ralls,et al.  Prefabricated Bridge Elements and Systems in Japan and Europe , 2005 .

[7]  Tejas Prakash Arurkar ACCELERATED CONSTRUCTION DECISION MAKING PROCESS , 2006 .

[8]  Karl E Wunderlich,et al.  Estimating User Costs and Economic Impacts of Roadway Construction in Six Federal Lands Projects , 2007 .

[9]  Benjamin Tang Framework for Prefabricated Bridge Elements and Systems (PBES) Decision-Making , 2006 .

[10]  T. L. Saaty A Scaling Method for Priorities in Hierarchical Structures , 1977 .

[11]  Thomas L. Saaty,et al.  How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[12]  G. A. Miller THE PSYCHOLOGICAL REVIEW THE MAGICAL NUMBER SEVEN, PLUS OR MINUS TWO: SOME LIMITS ON OUR CAPACITY FOR PROCESSING INFORMATION 1 , 1956 .

[13]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[14]  Thomas L. Saaty,et al.  Group decision making using the analytic hierarchy process , 1993 .

[15]  John R Fowler,et al.  Accelerated Bridge Construction , 2006 .