Economic Design of Short-Run CSP-1 Plan Under Linear Inspection Cost
暂无分享,去创建一个
[1] Grace L. Yang. A Renewal-Process Approach to Continuous Sampling Plans , 1983 .
[2] Bruce W. Turnbull,et al. Probability limits on outgoing quality for continuous sampling plans , 1991 .
[3] M. T. R. Blackwell. The Effect of Short Production Runs on CSP-1 , 1977 .
[4] Bruce W. Turnbull,et al. New performance measures for continuous sampling plans applied to finite production runs , 1992 .
[5] Chao-Yu Chou,et al. Economic design of continuous sampling plan under linear inspection cost , 2002 .
[6] Lisa M. Maillart,et al. DEMONSTRATING DEMING'S kp RULE USING AN ECONOMIC MODEL OF THE CSP-1 , 2000 .
[7] Reay-Chen Wang,et al. Minimum average fraction inspected for short-run CSP-1 plan , 1998 .
[8] Ming C. Liu,et al. Computerized continuous sampling plans with finite production , 1993 .
[9] H. F. Dodge. A Sampling Inspection Plan for Continuous Production , 1943, Journal of Fluids Engineering.