Information technology project failure is the problem which quite hard to avoid. The main problems of IT project failure are scope, time, and cost. These three contains is affecting to each other. Time and cost are the impact of the changing in scope. About 50% – 80% of IT Projects are defined as failure project which is mostly caused by over time and over cost. In client side, the problems come from unrealistic expectations also misunderstanding in collecting requirements in order to develop a system. These problems are leading into many changes in system development and changes will leads into poor scope management. In this research, we will analyze the influence of poor scope management affecting the successful of IT Project. In this research, began by analyze the correlation between Unrealistic Expectation and Changes in Project. The second steps is to analyze the correlation between Changes in Project and Overtime and Overcost. The Third steps it to analyze the Failure Project which defined by acceptance status of client and its correlation with Overcost and Overtime. Statistic method used in this research is Chi-Square. The result shows a tight bond between Unrealistic Expectation to Project Failure.
[1]
G. G. Stokes.
"J."
,
1890,
The New Yale Book of Quotations.
[2]
Vicente Rodríguez Montequín,et al.
Analysis of the Success Factors and Failure Causes in Information & Communication Technology (ICT) Projects in Spain☆
,
2014
.
[3]
Osama Abbas Hussain.
Direct Cost Of Scope Creep In Governmental Construction Projects In Qatar
,
2012
.
[4]
Charles B. Daniels,et al.
The Root Cause of Failure in Complex IT Projects: Complexity Itself
,
2013,
Complex Adaptive Systems.
[5]
Sherif A. Mazen,et al.
Governance of Post-Construction Activities in IS Development Projects
,
2012
.
[6]
Saleem Abuleil,et al.
A Taxonomy of an IT Project Failure: Root Causes
,
2009
.
[7]
Takako Nakatani,et al.
Project Management Patterns to Prevent Schedule Delay Caused by Requirement Elicitation
,
2010,
IEICE Trans. Inf. Syst..