Construction supervision on the excavation and support of underground diversion and power generation system of Longtan Hydropower Station

This paper introduces the concrete circumstances about the construction supervision on the excavation and support of underground diversion and power generation system of the Longtan Hydropower Station It emphasizes the technical support and forecast control Under the control, management and harmonization of supervision engineers,it will make it more reasonable and favorable the resources of construction, the productive experimentation, the connection of working surface, the logic network connection It can also make the plan and the concrete parameters of construction to be more accord with the project fact and the control requirements about the quality and safety,so it is sure that the safety, quality, schedule, investment, civilization construction of the project would be in good control