Capacitated material requirements planning considering delivery constraints.
暂无分享,去创建一个
[1] Raul Poler Escoto,et al. A conceptual model for the production and transport planning process: An application to the automobile sector , 2008, Comput. Ind..
[2] Shaojun Wang,et al. An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy , 2005, Eur. J. Oper. Res..
[3] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .
[4] Bhaba R. Sarker,et al. Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers , 2009, Eur. J. Oper. Res..
[5] Josefa Mula,et al. Capacity and material requirement planning modelling by comparing deterministic and fuzzy models , 2008 .
[6] Thomas Y. Choi,et al. Unveiling the structure of supply networks: case studies in Honda, Acura, and DaimlerChrysler , 2002 .
[7] Jean-François Cordeau,et al. An integrated model for logistics network design , 2006, Ann. Oper. Res..
[8] Jan Riezebos,et al. Lean Production and information technology: Connection or contradiction? , 2009, Comput. Ind..
[9] Asoo J. Vakharia,et al. Integrated production/distribution planning in supply chains: An invited review , 1999, Eur. J. Oper. Res..
[10] Ann van Ackere,et al. Trading off between heijunka and just-in-sequence , 2009 .
[11] C.-C. Chern,et al. A heuristic algorithm for master planning that satisfies multiple objectives , 2007, Comput. Oper. Res..
[12] Christoph A. Schneeweiss,et al. Distributed Decision Making , 2003 .
[13] Michael Pinedo,et al. Planning and Scheduling in Supply Chains: An Overview of Issues in Practice , 2004 .