An effective algorithm for the capacitated single item lot size problem
暂无分享,去创建一个
Chien-Hua M. Lin | Chia-Shin Chung | James Flynn | Chien-Hua Mike Lin | James Flynn | Chia-Shin Chung
[1] M. G. Korgaonker. Production Smoothing Under Piecewise Concave Costs, Capacity Constraints and Nondecreasing Requirements , 1977 .
[2] T. Morton,et al. General Planning Horizons for Production Smoothing with Deterministic Demands , 1974 .
[3] E. Zabel. Some Generalizations of an Inventory Planning Horizon Theorem , 1964 .
[4] H. Kunreuther,et al. Planning Horizons for the Dynamic Lot Size Model with Backlogging , 1974 .
[5] Howard Kunreuther,et al. Planning Horizons for Production Smoothing with Deterministic Demands: I. All Demand Met from Regular Production , 1973 .
[6] J. K. Lenstra,et al. Deterministic Production Planning: Algorithms and Complexity , 1980 .
[7] M. Florian,et al. DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS. , 1971 .
[8] F. J. Gould,et al. Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model , 1969 .
[9] M. Lambrecht,et al. A capacity constrained single-facility dynamic lot-size model , 1978 .
[10] Paul H. Zipkin,et al. A dynamic lot-size model with make-or-buy decisions , 1989 .
[11] Stephen F. Love. Bounded Production and Inventory Models with Piecewise Concave Costs , 1973 .
[12] A. F. Veinott. Extreme points of leontief substitution systems , 1968 .
[13] Chien-Hua M. Lin,et al. An OT2 Algorithm for the NI/G/NI/ND Capacitated Lot Size Problem , 1988 .
[14] C. Swoveland. A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs , 1975 .
[15] K. R. Baker,et al. An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints , 1978 .
[16] Ömer Kirca. An efficient algorithm for the capacitated single item dynamic lot size problem , 1990 .
[17] A. Federgruen,et al. A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0n log n or 0n Time , 1991 .
[18] Albert P. M. Wagelmans,et al. Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case , 1992, Oper. Res..
[19] Gerald L. Thompson,et al. A Forward Algorithm for the Capacitated Lot Size Model with Stockouts , 1990, Oper. Res..
[20] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[21] Rolf A. Lundin,et al. Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results , 1975, Oper. Res..
[22] G. Bitran,et al. Computational Complexity of the Capacitated Lot Size Problem , 1982 .
[23] M. Rao,et al. A Class of Deterministic Production Planning Problems , 1973 .