Visualization of the Modeled Degradation of Building Flooring Systems in Building Maintenance
暂无分享,去创建一个
[1] F. Stuart Chapin,et al. Activity Systems and Urban Structure: A Working Schema , 1968 .
[2] Melanie Hartmann. Building Design Evaluation Costs In Use , 2016 .
[3] Nashwan Dawood,et al. Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies , 2006, Comput. Aided Civ. Infrastructure Eng..
[4] Eddy Krygiel,et al. Green BIM: Successful Sustainable Design with Building Information Modeling , 2008 .
[5] John Haymaker,et al. Challenges and Benefits of 4D Modeling on the Walt Disney Concert Hall Project , 2001 .
[6] Nigel Barley. Design in a Tribal Context , 1992 .
[7] Susanne Hertz,et al. Personal Space The Behavioral Basis Of Design , 2016 .
[8] P. J. Puntenney,et al. Informing environmental policy making , 1995 .
[9] Jane Matthews,et al. Incorporating embodied energy in the BIM process , 2012 .
[10] Vineet R. Kamat,et al. Scene Graph and Frame Update Algorithms for Smooth and Scalable 3D Visualization of Simulated Construction Operations , 2002 .
[11] Chaomei Chen,et al. Information Visualisation and Virtual Environments , 1999 .
[12] Mary Lou Maher,et al. Multidisciplinary collaborative design in virtual environments , 2007 .
[13] E. Hall,et al. The Hidden Dimension , 1970 .
[14] Hans-Jürgen Dr. Klüppel,et al. The Revision of ISO Standards 14040-3 - ISO 14040: Environmental management Life cycle assessment Principles and framework - ISO 14044: Environmental management Life cycle assessment Requirements and guidelines , 2005 .
[15] Jon T. Lang,et al. Designing for human behavior : architecture and the behavioral sciences , 1974 .
[16] Ann T. Jordan. Managing Diversity: Translating Anthropological Insight for Organization Studies , 1995 .
[17] Thomas Froese,et al. Study of information technology development for the Canadian construction industry , 2007 .
[18] Yusuf Arayici,et al. Divercity: A virtual construction design & briefing environment , 2002 .
[19] Assem Al-Hajj,et al. Modelling the running costs of buildings , 1998 .
[20] Kent A. Reed,et al. Using VRML in construction industry applications , 2000, VRML '00.
[21] Merih Aydinalp,et al. Modeling of the appliance, lighting, and space-cooling energy consumptions in the residential sector using neural networks , 2002 .
[22] Amip J. Shah,et al. Thermodynamics-Based Object-Oriented Environmental Design of an Industrial Air Conditioner , 2009 .
[23] G. Keoleian,et al. Life‐Cycle Energy, Costs, and Strategies for Improving a Single‐Family House , 2000 .
[24] Peter Tregenza. The design of interior circulation: People and buildings , 1976 .
[25] David Pennington,et al. Recent developments in Life Cycle Assessment. , 2009, Journal of environmental management.
[26] A. Akintoye,et al. Public Private Partnerships: Managing Risks and Opportunities , 2003 .
[27] Vineet R. Kamat,et al. Algorithm for Accurate Three-Dimensional Scene Graph Updates in High-Speed Animations of Previously Simulated Construction Operations , 2009, Comput. Aided Civ. Infrastructure Eng..
[28] Thomas Olofsson,et al. Building energy parameter investigations based on multivariate analysis , 2009 .
[29] Rod Gameson,et al. Private finance initiative in use , 2009 .
[30] P. Medawar,et al. The measure of man , 1981, Nature.
[31] Walter Klöpffer,et al. The Hitch Hiker´s Guide to LCA - An orientation in LCA methodology and application , 2006 .
[32] Adrian Pitts. Future proof construction-Future building and systems design for energy and fuel flexibility , 2008 .
[33] Lawrence L. Lapin. Probability and Statistics for Modern Engineering , 1983 .
[34] C. Bellone,et al. ON A ROLE , 1996 .
[35] Ben Shneiderman,et al. Readings in information visualization - using vision to think , 1999 .
[36] Vineet R. Kamat,et al. VISUALIZING SIMULATED CONSTRUCTION OPERATIONS IN 3 D By , 2001 .
[37] Armin B. Cremers,et al. Awareness and workflow based coordination of networked co-operations in structural design , 2006, J. Inf. Technol. Constr..
[38] Yuan Fang,et al. Enhancing the logistics of construction materials through activity‐based simulation approach , 2009 .
[39] Manoj K. Jha. Feasibility of Computer Visualization in Highway Development: A Fuzzy Logic-Based Approach , 2006, Comput. Aided Civ. Infrastructure Eng..
[40] Keith A. Jones,et al. Computerized maintenance management systems , 1996 .
[41] Julio C. Martinez,et al. Visualizing Simulated Construction Operations in 3D , 2001 .
[42] Nagaraju Rangaraju,et al. Framework for immersive visualization of building analysis data , 2001, Proceedings Fifth International Conference on Information Visualisation.
[43] Weiming Shen,et al. Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review , 2010, Adv. Eng. Informatics.
[44] David J. Hogan,et al. Wayfinding Design Guidelines , 2007 .
[45] Farzad Khosrowshahi,et al. Visualisation of impact of time on the internal lighting of a building , 1998 .
[46] Jianping Zhang,et al. Development and Implementation of an Industry Foundation Classes‐Based Graphic Information Model for Virtual Construction , 2014, Comput. Aided Civ. Infrastructure Eng..
[47] Ghassan Aouad,et al. Developing a conceptual model for an integrated database , 1997, Proceedings Intelligent Information Systems. IIS'97.
[48] Zehra Waheed,et al. Knowledge based facilities management , 2009 .
[49] Ignacio Zabalza Bribián,et al. Life cycle assessment in buildings: State-of-the-art and simplified LCA methodology as a complement for building certification , 2009 .
[50] Nuno Gil,et al. Introduction: Infrastructure Meets Business: Building New Bridges, Mending Old Ones , 2009 .
[51] Eduardo Miranda,et al. Numerical Methods to Simulate and Visualize Detailed Crane Activities , 2009, Comput. Aided Civ. Infrastructure Eng..
[52] Ganesh S. Oak. Information Visualization Introduction , 2022 .
[53] Ernst Rank,et al. From a Product Model to Visualization: Simulation of Indoor Flows with Lattice‐Boltzmann Methods , 2004 .
[54] Paul Wordsworth. Lee's Building Maintenance Management , 2012 .