Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates

Abstract We present inventory models to schedule an imperfect manufacturing process where a proportion of the items are defective. The proportion is known; and the production is followed by a 100% inspection. The manufacturer implements a rework strategy to rectify the defective items. Since the rework can be implemented on a number of plans, a flexible rework rate is presented. The flexible rework offers the manufacturer the selection of the rework rate, which can be different from the production rate, and also the selection of the rework process itself, which can be asynchronous and synchronous. Under the asynchronous rework, the defective items are kept until the completion of the production lot; while, under the synchronous rework, the defective items are reworked as soon as they are produced. A linear rework cost function of the rework rate is assumed. The objective of this paper is to develop mathematical models to determine the optimal lot sizes and backorders for different assumptions about the rework rate and the rework process. It has been proven that the rework strategy and the rework rate influence the lot size and the backorder, especially for large values of the defective proportion.

[1]  Harun Öztürk A note on “Production lot sizing with quality screening and rework” , 2017 .

[2]  Shey-Huei Sheu,et al.  Production , Manufacturing and Logistics Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance , 2008 .

[3]  Bhaba R. Sarker,et al.  Optimal batch sizing in a multi-stage production system with rework consideration , 2008, Eur. J. Oper. Res..

[4]  H. Wee,et al.  An economic production quantity model for deteriorating items with multiple production setups and rework , 2012 .

[5]  Nan Li,et al.  An EPQ Model for Deteriorating Production System and Items with Rework , 2015 .

[6]  Ata Allah Taleizadeh,et al.  Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint , 2010, J. Comput. Appl. Math..

[7]  Jia-Tzer Hsu,et al.  Economic production quantity (EPQ) models under an imperfect production process with shortages backordered , 2016, Int. J. Syst. Sci..

[8]  Hui-Ming Wee,et al.  Multi-product production quantity model with repair failure and partial backordering , 2010, Comput. Ind. Eng..

[9]  H. S. Shukla,et al.  Economic production quantity model for defective items under deterioration , 2016 .

[10]  Muhammad Al-Salamah,et al.  Economic production quantity in batch manufacturing with imperfect quality, imperfect inspection, and destructive and non-destructive acceptance sampling in a two-tier market , 2016, Comput. Ind. Eng..

[11]  Shey-Huei Sheu,et al.  Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance , 2011 .

[12]  S. T. A. Niaki,et al.  A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost , 2015 .

[13]  Ata Allah Taleizadeh,et al.  Optimizing integrated manufacturing and products inspection policy for deteriorating manufacturing system with imperfect inspection , 2015 .

[14]  Ping Yang,et al.  Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs , 1996 .

[15]  D. Tsai Economic production quantity with imperfect production processes and learning effects , 2009 .

[16]  Hui-Ming Wee,et al.  An economic production quantity model with non-synchronized screening and rework , 2014, Appl. Math. Comput..

[17]  Tarun Gupta,et al.  Looping in a multistage production system , 1984 .

[18]  Hadi Mokhtari,et al.  A joint internal production and external supplier order lot size optimization under defective manufacturing and rework , 2018 .

[19]  K. S. Chaudhuri,et al.  Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..

[20]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[21]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..

[22]  Walid W. Nasr,et al.  Production lot sizing with quality screening and rework , 2016 .

[23]  Mir-Bahador Aryanezhad,et al.  An economic production quantity model with random yield subject to process compressibility , 2012, Math. Comput. Model..

[24]  Y. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .

[25]  Debjani Chakraborty,et al.  A fuzzy random EPQ model with fuzzy defective rates and fuzzy inspection errors , 2016, J. Intell. Fuzzy Syst..

[26]  B. Sarkar,et al.  An economic production quantity model with random defective rate, rework process and backorders for a single stage production system , 2014 .

[27]  W. M. Chan,et al.  A new EPQ model: integrating lower pricing, rework and reject situations , 2003 .

[28]  Hui-Ming Wee,et al.  Economic production quantity model with repair failure and limited capacity , 2013 .

[29]  Nita H. Shah,et al.  EPQ model for returned/reworked inventories during imperfect production process under price-sensitive stock-dependent demand , 2018, Oper. Res..

[30]  Lakdere Benkherouf,et al.  Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model , 2017, RAIRO Oper. Res..

[31]  Singa PWang Chiu,et al.  An economic production quantity model with the rework process of repairable defective items , 2003 .

[32]  Seung Ho Yoo,et al.  Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return , 2009 .

[33]  P. A. Hayek,et al.  Production lot sizing with the reworking of imperfect quality items produced , 2001 .

[34]  Chao-Kuei Huang An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration , 2004 .

[35]  Bhaba R. Sarker,et al.  Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..

[36]  Allen H. Tai Economic production quantity models for deteriorating/imperfect products and service with rework , 2013, Comput. Ind. Eng..

[37]  Ata Allah Taleizadeh,et al.  A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process , 2014 .

[38]  M. Chandra,et al.  OPTIMAL BATCH SIZE AND INVESTMENT IN MULTISTAGE PRODUCTION SYSTEMS WITH SCRAP , 1997 .