Pile Setup in Cohesive Soil. I: Experimental Investigation

AbstractPile setup in cohesive soils has been a known phenomenon for several decades. However, a systematic field investigation to provide the needed data to develop analytical procedures and integrate pile setup into the design method rarely exists. This paper summarizes a recently completed field investigation on five fully instrumented steel H-piles embedded in cohesive soils, while a companion paper discusses the development of the pile setup method. During the field investigation, detailed soil characterization, monitoring of soil total lateral stress and pore-water pressure, collection of pile dynamic restrike data as a function of time, and vertical static load tests were completed. Restrike measurements confirm that pile setup occurs at a logarithmic rate following the end of driving, and its development correlates well with the rate of dissipation of the measured pore-water pressure. Based on the field data collected, it was concluded that the skin friction component, not the end bearing, contrib...