Simultaneous optimisation of stope layouts and long term production schedules
暂无分享,去创建一个
[1] M L Smith,et al. The connection between production schedule and cut-off optimization in underground mines , 2005 .
[2] Majid Ataee-pour. Optimisation of stope limits using a heuristic approach , 2004 .
[3] Erkan Topal,et al. Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling , 2008 .
[4] Erkan Topal,et al. An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling , 2010 .
[5] Ian Porter,et al. 35th Symposium on Application of Computers and Operations Research in Mineral Industry, The Australasian Institute of Mining and Metallurgy , 2011 .
[6] Erkan Topal,et al. A new mathematical programming model for production schedule optimization in underground mining operations , 2010 .
[7] C. Alford,et al. Optimisation in underground mine design , 1996 .
[8] R. Dimitrakopoulos,et al. Managing grade risk in stope design optimisation: probabilistic mathematical programming model and application in sublevel stoping , 2007 .
[9] Erkan Topal,et al. A new algorithm for stope boundary optimization , 2010 .
[10] Erkan Topal,et al. Production schedule optimisation in underground hard rock mining using mixed integer programming , 2007 .