Location selection of seawater pumped hydro storage station in China based on multi-attribute decision making

With the urgent need for energy conservation and intrinsic intermittence optimization, seawater pumped hydro energy storage (SPHS) is developing rapidly in the foreign countries but no one has been built in China. Nevertheless, with vast resources, our country pays much attention on SPHS site selection lately since its superiority and the need for long-term energy development. To select the most ideal SPHS site from numerous candidate alternatives, 18 evaluation criteria are set in this paper. Due to vague relevance among criteria, λ-fuzzy measure combining Analytic Hierarchy Process (AHP) and entropy weight method are proposed to determine criteria weights. Later, fuzzy Vlsekriterijumska Optimizacija I Kompromisno Resenje (VIKOR) method is applied to sort an optimal solution for the SPHS construction. Simultaneously, the published data from National Energy Administration (NEA) combining experts' scoring and public opinions are calculated as a case and the Fu Ying Island in Ning De is proved to be the best. In order to ensure the validity and stability of the result, comparative and sensitive analysis are proposed. Overall, the proposed model can provide a reference to the government and electricity grid for further evaluation since SPHS site selection has not been deeply studied in China.

[1]  I. Bryden,et al.  Social and ecological impacts of marine energy development , 2015 .

[2]  Jianping Li,et al.  Determining the fuzzy measures in multiple criteria decision aiding from the tolerance perspective , 2018, Eur. J. Oper. Res..

[3]  Chongqing Kang,et al.  Reducing curtailment of wind electricity in China by employing electric boilers for heat and pumped hydro for energy storage , 2016 .

[4]  D. Dubois,et al.  Operations on fuzzy numbers , 1978 .

[5]  Ahmad Makui,et al.  A new flexible and reliable interval valued fuzzy VIKOR method based on uncertainty risk reduction in decision making process: An application for determining a suitable location for digging some pits for municipal wet waste landfill , 2014, Comput. Ind. Eng..

[6]  Prasanta Kumar Dey,et al.  Integrated project evaluation and selection using multiple-attribute decision-making technique , 2006 .

[7]  Dimitris Al. Katsaprakakis,et al.  Technical details regarding the design, the construction and the operation of seawater pumped storage systems , 2013 .

[8]  Tian Qichong The Application of Entropy Method and AHP in Weight Determining , 2009 .

[9]  Manuel Chazarra,et al.  Trends and challenges in the operation of pumped-storage hydropower plants , 2015 .

[10]  David Connolly,et al.  Development of a computer program to locate potential sites for pumped hydroelectric energy storage , 2010 .

[11]  Abdolvahhab Fetanat,et al.  A novel hybrid MCDM approach for offshore wind farm site selection: A case study of Iran , 2015 .

[12]  E. Alameda-Hernandez,et al.  Optimal site selection for upper reservoirs in pump-back systems, using geographical information systems and multicriteria analysis , 2016 .

[13]  Arvind R. Singh,et al.  A review of multi criteria decision making (MCDM) towards sustainable renewable energy development , 2017 .

[14]  Jianfei Shen,et al.  Overall review of peaking power in China: Status quo, barriers and solutions , 2015 .

[15]  Carlo Alberto Magni,et al.  Investment, Financing and the Role of ROA and WACC in Value Creation , 2015, Eur. J. Oper. Res..

[16]  Kannan Govindan,et al.  Application of fuzzy VIKOR for evaluation of green supply chain management practices , 2015 .

[17]  Jianping Yuan,et al.  Study of decision framework of offshore wind power station site selection based on ELECTRE-III under intuitionistic fuzzy environment: A case of China , 2016 .

[18]  Michio Sugeno,et al.  Fuzzy identification of systems and its applications to modeling and control , 1985, IEEE Transactions on Systems, Man, and Cybernetics.

[19]  Sayed Khatiboleslam Sadrnezhaad,et al.  MCDM selection of pulse parameters for best tribological performance of Cr–Al2O3 nano-composite co-deposited from trivalent chromium bath , 2017 .

[20]  Dong Jun,et al.  Macro-site selection of wind/solar hybrid power station based on ELECTRE-II , 2014 .

[21]  Lei Zhu,et al.  Correlation Measures of Dual Hesitant Fuzzy Sets , 2013, J. Appl. Math..

[22]  Alessio Ishizaka,et al.  Are multi-criteria decision-making tools useful? An experimental comparative study of three methods , 2018, Eur. J. Oper. Res..

[23]  Ping Feng,et al.  Research of development strategy on China’s rural drinking water supply based on SWOT–TOPSIS method combined with AHP-Entropy: a case in Hebei Province , 2015, Environmental Earth Sciences.

[24]  Cem Çağrı Dönmez,et al.  Siting of a central healthcare waste incinerator using GIS-based Multi-Criteria Decision Analysis , 2017 .

[25]  Raman Kumar,et al.  Multi objective optimization using different methods of assigning weights to energy consumption responses, surface roughness and material removal rate during rough turning operation , 2017 .

[26]  Madan K. Jha,et al.  Comparison of Analytic Hierarchy Process, Catastrophe and Entropy techniques for evaluating groundwater prospect of hard-rock aquifer systems , 2017 .

[27]  Kai Chen,et al.  A hybrid approach combining an extended BBO algorithm with an intuitionistic fuzzy entropy weight method for QoS-aware manufacturing service supply chain optimization , 2018, Neurocomputing.

[28]  Haruo Imano,et al.  Development of Pump Turbine for Seawater Pumped- Storage Power Plant , 1999 .

[29]  Gwo-Hshiung Tzeng,et al.  Brand marketing for creating brand value based on a MCDM model combining DEMATEL with ANP and VIKOR methods , 2012, Expert Syst. Appl..

[30]  Shu-Ping Wan,et al.  A new method for multi-attribute group decision making with triangular intuitionistic fuzzy numbers , 2016, Kybernetes.

[31]  Khelchandra Thongam,et al.  Ranking of Sites for Installation of Hydropower Plant Using MLP Neural Network Trained with GA: A MADM Approach , 2017, Comput. Intell. Neurosci..

[32]  Changyong Liang,et al.  Aggregation Operators on Triangular Intuitionistic Fuzzy Numbers and its Application to Multi-Criteria Decision Making Problems , 2014 .

[33]  Ümran Şengül,et al.  Fuzzy TOPSIS method for ranking renewable energy supply systems in Turkey , 2015 .

[34]  Jianwei Gao,et al.  An Extended VIKOR-Based Approach for Pumped Hydro Energy Storage Plant Site Selection with Heterogeneous Information , 2017, Inf..

[35]  Helena M. Ramos,et al.  Pumped-Storage Solution towards Energy Efficiency and Sustainability: Portugal Contribution and Real Case Studies , 2014 .

[36]  Nazli Yonca Aydin,et al.  GIS-based site selection methodology for hybrid renewable energy systems: A case study from western Turkey , 2013 .

[37]  Michio Sugeno,et al.  A Model of Human Evaluation Process Using Fuzzy Measure , 1985, Int. J. Man Mach. Stud..

[38]  Gwo-Hshiung Tzeng,et al.  Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..

[39]  Tsukasa Yoshimura,et al.  Seawater pumped-storage power plant in Okinawa island, Japan , 1993 .

[40]  Raquel Segurado,et al.  Optimization of a wind powered desalination and pumped hydro storage system , 2016 .

[41]  Eamon McKeogh,et al.  Techno-economic review of existing and new pumped hydro energy storage plant , 2010 .

[42]  Abdolhamid Safaei Ghadikolaei,et al.  A resilience approach for supplier selection: Using Fuzzy Analytic Network Process and grey VIKOR techniques , 2017 .

[43]  Patrick T.I. Lam,et al.  Potential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region , 2010 .

[44]  Eoin D McLean,et al.  An Evaluation of Seawater Pumped Hydro Storage for Regulating the Export of Renewable Energy to the National Grid , 2014 .

[45]  Shu-Ping Wan,et al.  The extended VIKOR method for multi-attribute group decision making with triangular intuitionistic fuzzy numbers , 2013, Knowl. Based Syst..

[46]  Mathieu David,et al.  Optimal design of a storage system coupled with intermittent renewables , 2014 .

[47]  Lucila Maria de Souza Campos,et al.  CO2 emissions: A quantitative analysis among the BRICS nations , 2018 .

[48]  Shuai Geng,et al.  Multi-criteria decision making on selection of solar–wind hybrid power station location: A case of China , 2014 .

[49]  Robin Girard,et al.  A generic GIS-based method for small Pumped Hydro Energy Storage (PHES) potential evaluation at large scale , 2017 .

[50]  Hu Xu,et al.  Multi-criteria decision-making on assessment of proposed tidal barrage schemes in terms of environmental impacts. , 2017, Marine pollution bulletin.

[51]  K. Govindan,et al.  Multi-tier sustainable global supplier selection using a fuzzy AHP-VIKOR based approach , 2018 .

[52]  Min Gao,et al.  Decision framework of solar thermal power plant site selection based on linguistic Choquet operator , 2014 .

[53]  Wang Xu Research on the Green Vendor Selection Index Weight of Iron & Steel Enterprises Based on AHP and Entropy Method , 2010 .

[54]  Akintola Akintoye,et al.  Analysis of factors influencing project cost estimating practice , 2000 .

[55]  Zeshui Xu,et al.  Dual hesitant fuzzy VIKOR method for multi-criteria group decision making based on fuzzy measure and new comparison method , 2017, Inf. Sci..

[56]  Patrick T.I. Lam,et al.  Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region , 2009 .