Application of Drain Board and Dynamic Consolidation in Foundation Treatment of Caofeidian Ore Terminal Phase-3 Project

Based on foundation treatment detail of Caofeidian ore terminal phase-3 project, the construction parameters were obtained by the experiments in trial area, the experimental process monitoring and the testing results analysis after completion of the project, which could be used to guide large area construction and optimize the foundation treatment. The research results will provide reference for the design and construction of similar projects.