Insurable and non-insurable risks in complex project deals: case of the Ghanaian construction industry

Purpose The purpose of this study is to investigate the insurable risks that impacted the operations on complex construction projects in developing countries using Ghana as a case study. Design/methodology/approach In this study, structured questionnaires were used to collect relevant information from the top management of construction and insurance firms in Ghana, comprising 50 industry professionals. The study adopted the χ2 and independent samples’ t test to interpret the responses from participants. Findings The study revealed the major risks that severely impacted the operations on complex construction projects, including strikes and labour disputes, long waiting time for approval of test samples, damages to property during construction, delay in payment to contractor for work done, poor construction method, pressure to deliver project on an accelerated schedule, labour shortage, permits delayed or take longer than expected, inaccurate materials estimating, change in weather pattern, low productivity of subcontractors and inadequate contractor experience. Practical implications The study is expected to contribute to increase in the awareness of the insurable risks and policies that project participants are exposed to, which will serve as a decision-making tool for contract formation. Originality/value This study assists in managing construction and insurance firms to note the major risk in managing a complex construction project. In addition to knowing the major risks identified, the study investigates the insurable risk by managing both construction and insurance firms.

[1]  D. Owusu-Manu,et al.  Service quality of insurance in complex project deals in the construction industry in Ghana , 2020 .

[2]  Ł. Bednarz,et al.  Analysis of the Condition of Damaged Vaults after a Construction Disaster in a Historic Church , 2019, Key Engineering Materials.

[3]  S. El-Sayegh,et al.  Risk identification and assessment in sustainable construction projects in the UAE , 2018, International Journal of Construction Management.

[4]  W. Mcconnell,et al.  Emerging Patterns in Construction Defect Litigation: Survey of Construction Cases , 2018, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction.

[5]  Xiaohui Li,et al.  Critical Behavioral Risk Factors among Principal Participants in the Chinese Construction Industry , 2018, Sustainability.

[6]  Muhammad Jamaluddin Thaheem,et al.  Critical External Risks in International Joint Ventures for Construction Industry in Pakistan , 2018 .

[7]  Jingdong Qu,et al.  Social Construction and the Governance of Labor Relations , 2018 .

[8]  Lyubov Manukhina,et al.  Specific features of modern multifunctional high-rise building construction , 2018 .

[9]  Ming Li,et al.  Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model , 2017 .

[10]  Main Factors Causing Delays in Large Construction Projects: Evidence from New Zealand , 2017 .

[11]  Rao Aamir Khan,et al.  Emperical study of critical risk factors causing delays in construction projects , 2017, 2017 9th IEEE International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications (IDAACS).

[12]  B. Ogutu FACTORS INFLUENCING SUCCESSFUL COMPLETION OF ROAD CONSTRUCTION PROJECTS IN KENYA: THE CASE OF KISUMU COUNTY , 2017 .

[13]  D. Boyd,et al.  Postscript: facing the changing world of clients and users , 2017 .

[14]  Lu-Ming Tseng,et al.  The insurance agents’ intention to make inappropriate product recommendations: Some observations from Taiwan life insurance industry , 2016 .

[15]  Xianbo Zhao,et al.  Risk Paths in International Construction Projects: Case Study from Chinese Contractors , 2016 .

[16]  Helen Lingard,et al.  Stakeholder Perceptions of Risk in Construction. , 2016, Safety science.

[17]  Sepani Senaratne,et al.  Communication in construction: a management perspective through case studies in Sri Lanka , 2016 .

[18]  P. Luukka,et al.  New fuzzy insurance pricing method for giga-investment project insurance , 2015 .

[19]  Tsu-Wei Yu,et al.  Developing life insurer-insurance intermediary relationships , 2014 .

[20]  Annor Osei-Fosu Strategies to improve the risk factors that affect cost estimation in the Building Construction Industry in GHANA , 2014 .

[21]  Dirk Helbing,et al.  Globally networked risks and how to respond , 2013, Nature.

[22]  Hamzah Abdul-Rahman,et al.  Applying Risk Management Workshop for a Public Construction Project: Case Study , 2013 .

[23]  Hamzah Bin Hj Abdul Rahman,et al.  Applying Risk Management Workshop for a Public Construction Project: Case Study. , 2013 .

[24]  Kalle Kähkönen Programming and Scheduling Techniques , 2012 .

[25]  Mendel Giezen,et al.  Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning , 2012 .

[26]  M. S. Ishak,et al.  Conceptual framework of good management from the Islamic perspective , 2012 .

[27]  Anas K. Odonkor The effect of strategic risk management on project delivery; a case study of the construction industry in Ghana , 2011 .

[28]  G. Hagan,et al.  MANAGING COMPLEX PROJECTS IN MULTI-PROJECT ENVIRONMENTS , 2011 .

[29]  Li Yu-hu,et al.  On risk management of construction industry , 2009 .

[30]  Stephen O. Ogunlana,et al.  Managing risk in software development projects: a case study , 2007, Ind. Manag. Data Syst..

[31]  Low Sui Pheng,et al.  Environmental factors and work performance of project managers in the construction industry , 2006 .

[32]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[33]  Ming-Teh Wang,et al.  Risk Allocation and Risk Handling of Highway Projects in Taiwan , 2003 .

[34]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[35]  Roger Miller,et al.  Understanding and Managing Risks in Large Engineering Projects , 2001 .

[36]  Detmar Heidenhain Managing Technological Risks: A Challenge for Professional Engineering Insurers , 2001 .

[37]  Mohan V. Tatikonda,et al.  Technology novelty, project complexity, and product development project execution success: a deeper look at task uncertainty in product innovation , 2000, IEEE Trans. Engineering Management.

[38]  Karlos Artto,et al.  Unknown Soldier Revisited: A Story of Risk Management , 2000 .

[39]  J. Ramalho-Santos,et al.  Cronbach's alpha: a tool for assessing the reliability of scales , 1999 .

[40]  Steven C. Padgitt,et al.  Extension's Portfolio for the 21st Century: A Place for One-on-One Consultations , 1999 .

[41]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[42]  Chris Chapman,et al.  Risk-management perspective on the project lifecycle , 1995 .