e Arve Industries Haute-Savoie Mont-Blanc.

[1]  Edward J. Hay The just-in-time breakthrough : implementing the new manufacturing basics , 1988 .

[2]  John Drew,et al.  Journey to lean : making operational change stick , 2004 .

[3]  E. Trist The Evolution of Socio-Technical Systems: A Conceptual Framework and an Action Research Program , 1981 .

[4]  Sabi Singh,et al.  Application of lean manufacturing techniques in the Emergency Department. , 2009, The Journal of emergency medicine.

[5]  H. Barkema,et al.  FOREIGN ENTRY, CULTURAL BARRIERS, AND LEARNING , 1996 .

[6]  R. Grant The Resource-Based Theory of Competitive Advantage: Implications for Strategy Formulation , 1991 .

[7]  L C Morey,et al.  A Comparison of Cluster Analysis Techniques Withing a Sequential Validation Framework. , 1983, Multivariate behavioral research.

[8]  T. Melton,et al.  The Benefits of Lean Manufacturing: What Lean Thinking has to Offer the Process Industries , 2005 .

[9]  Michael O. Ball,et al.  Optimization-Based Available-To-Promise with Multi-Stage Resource Availability , 2005, Ann. Oper. Res..

[10]  James F. Cox,et al.  An examination of just-in-time management for the small manufacturer: with an illustration , 1986 .

[11]  Jérôme Lérat-Pytlak,et al.  Le passage d' une certification ISO 9001 à un management par la qualité totale , 2002 .

[12]  Tarcisio Abreu Saurin,et al.  The impacts of lean production on working conditions: A case study of a harvester assembly line in Brazil , 2009 .

[13]  Jayant Rajgopal,et al.  Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .

[14]  Rachna Shah,et al.  Defining and developing measures of lean production , 2007 .

[15]  Anna Kochan Automotive industry looks for lean production , 1998 .

[16]  Cary L. Cooper,et al.  The effects of lean production on worker job stress , 2006 .

[17]  R. Słowiński,et al.  Aiding decisions with multiple criteria: essays in honor of Bernard Roy , 2002 .

[18]  John N. Pearson,et al.  Jit Manufacturing: a Survey of Implementations in Small and Large U.S. Manufacturers , 1999 .

[19]  Pius Achanga,et al.  Critical success factors for lean implementation within SMEs , 2006 .

[20]  Luis F. Alarcón,et al.  Assessing the Impacts of Implementing Lean Construction , 2008 .

[21]  S. M. James‐Moore,et al.  Is lean manufacture universally relevant? An investigative methodology , 1997 .

[22]  Richard Schroeder,et al.  Six Sigma: The Breakthrough Management Strategy Revolutionizing the World's Top Corporations , 1999 .

[23]  Donald C. Hambrick,et al.  Key success factors: Test of a general theory in the mature industrial‐product sector , 1989 .

[24]  Harvey M. Wagner,et al.  Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..

[25]  Todd A. Boyle,et al.  Lean, take two! Reflections from the second attempt at lean implementation , 2009 .

[26]  Ashish Nanda,et al.  Resources, Capabilities and Competencies , 1996 .

[27]  R. Boyer,et al.  Between imitation and innovation : the transfer and hybridization of productive models in the international automobile industry , 1998 .

[28]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .

[29]  Kiyoshi Suzaki,et al.  JAPANESE MANUFACTURING TECHNIQUES: THEIR IMPORTANCE TO U.S. MANUFACTURERS , 1985 .

[30]  Gisèle Mendy-Bilek,et al.  Amélioration de la synchronisation de la production sur une chaîne logistique , 2006 .

[31]  Lluís Cuatrecasas Arbós Design of a rapid response and high efficiency service by lean production principles: Methodology and evaluation of variability of performance , 2002 .

[32]  Christopher A. Voss,et al.  Application of Just‐in‐Time Manufacturing Techniques in the United Kingdom , 1987 .

[33]  Roberto Filippini,et al.  Sequences of operational improvements: some empirical evidence , 1998 .

[34]  D. L. Xu and J. B. Yang Modelling and analysis of uncertainties in multi-criteria decision making problems using the evidential reasoning approach , 2006 .

[35]  David Simchi-Levi,et al.  Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era (International Series in Operations Research & Management Science) , 2004 .

[36]  John K. Gershenson,et al.  Classification scheme for lean manufacturing tools , 2003 .

[37]  John R. Shook,et al.  Learning to See: Value Stream Mapping to Create Value and , 1998 .

[38]  S. D. Probert,et al.  Reducing the cost of preventive maintenance (PM) through adopting a proactive reliability-focused culture , 2006 .

[39]  Richard B. Chase,et al.  A classification and evaluation of research in operations management , 1980 .

[40]  A method to identify Resources of opportunity: illustration by an industrial case , 2011, 1101.3395.

[41]  Rajan Suri,et al.  Getting from “just-in-case” to “just-in-time”: Insights from a simple model , 1986 .

[42]  K. Demeter,et al.  The impact of lean practices on inventory turnover , 2011 .

[43]  Carol Reeves,et al.  DEFINING QUALITY: ALTERNATIVES AND IMPLICATIONS , 1994 .

[44]  Vagelis Dedoussis,et al.  SIMPLY A QUESTION OF CULTURAL BARRIERS? THE SEARCH FOR NEW PERSPECTIVES IN THE TRANSFER OF JAPANESE MANAGEMENT PRACTICES , 1995 .

[45]  E. Molleman,et al.  Work Design Issues in Lean Production from a Sociotechnical Systems Perspective: Neo-Taylorism or the Next Step in Sociotechnical Design? , 1998 .

[46]  Shigeo Shingo A Revolution in Manufacturing: The SMED System , 1985 .

[47]  Mélanie Vachon,et al.  Analyse de classification hirarchique et qualit de vie , 2005 .

[48]  Bill Ray,et al.  Lean Manufacturing -- A Systematic Approach to Improving Productivity in the Precast Concrete Industry , 2006 .

[49]  Hiroyuki Hirano,et al.  5 Pillars of the Visual Workplace: The Sourcebook for 5S Implementation , 1995 .

[50]  Claver Diallo,et al.  Développement d'un modèle d'identification et de gestion des pièces de rechange , 2006 .

[51]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[52]  Sang M. Lee,et al.  Just‐in‐Time Production System : Some Requirements for Implementation , 1984 .

[53]  Élisabeth Deshayes,et al.  Michael Hammer, James Champy, Le reengineering : réinventer l'entreprise pour une amélioration spectaculaire de ses performances, Paris, Dunod, 1993 , 1994 .

[54]  Richard L. Daft,et al.  Organization Theory and Design , 1983 .

[55]  R. Cagliano,et al.  Lean, Agile and traditional supply: how do they impact manufacturing performance? , 2004 .

[56]  Lauri Koskela,et al.  Moving-on — beyond lean thinking , 2004 .

[57]  Douglas A. Luke,et al.  Cluster analysis in community research: Epistemology and practice , 1993 .

[58]  Roger K. Blashfield,et al.  The Methods and Problems of Cluster Analysis , 1988 .

[59]  C Psenicka,et al.  Measuring Cluster Similarity across Methods , 2000, Psychological reports.

[60]  C. Mothe,et al.  Gouvernance et performance des pôles de PME , 2009 .

[61]  Michel Freyssenet,et al.  Quel modèle productif? : trajectoires et modèles industriels des constructeurs automobiles mondiaux , 2000 .

[62]  Christine Brossier,et al.  L'atelier et le robot : essai sur le fordisme et la production de masse à l'âge de l'électronique, Benjamin Coriat, Paris, Christian Bourgois Éditeur, 1990 , 1990 .

[63]  Donald Erlenkotter,et al.  An early classic misplaced: Ford W. Harris's economic order quantity model of 1915 , 1989 .

[64]  Toni L. Doolen,et al.  A review of lean assessment in organizations: An exploratory study of lean practices by electronics manufacturers , 2005 .

[65]  Maurice Pillet,et al.  Lean manufacturing in the screw cutting sector: assessment of maturity level , 2010 .

[66]  C. Prahalad,et al.  Strategy as a field of study: Why search for a new paradigm? , 2007 .

[67]  Cameron Orr Lean Leadership in Construction , 2005 .

[68]  Amrik S. Sohal,et al.  An Integrative Model of Japanese Manufacturing Techniques , 1990 .

[69]  Masaaki Imai,et al.  Gemba Kaizen: A Commonsense, Low-Cost Approach to Management , 1997 .

[70]  Y. Sugimori,et al.  Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .

[71]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[72]  Andrea Rangone,et al.  A Resource-Based Approach to Strategy Analysis in Small-Medium Sized Enterprises , 1999 .

[73]  A. Graves,et al.  Implementing Lean in aerospace-challenging the assumptions and understanding the challenges , 2003 .

[74]  Kai-Yuan Cai,et al.  System failure engineering and fuzzy methodology An introductory overview , 1996, Fuzzy Sets Syst..

[75]  M. Ball,et al.  Available to Promise , 2004 .

[76]  Pär Åhlström Sequences in the implementation of lean production , 1998 .

[77]  Kwang-Kyu Seo,et al.  A learning algorithm based estimation method for maintenance cost of product concepts , 2006, Comput. Ind. Eng..

[78]  E. James Flynn,et al.  World class manufacturing: an investigation of Hayes and Wheelwright's foundation , 1999 .

[79]  D Scheibler,et al.  Monte Carlo Tests of the Accuracy of Cluster Analysis Algorithms: A Comparison of Hierarchical and Nonhierarchical Methods. , 1985, Multivariate behavioral research.

[80]  Maurice Pillet,et al.  A Push-Pull Manufacturing Strategy: Analytical Model in the Screw Cutting Sector , 2010 .

[81]  Maurice Pillet,et al.  Critical analysis of a flow optimisation methodology by value stream mapping , 2010 .

[82]  M. Vaghefi,et al.  Toyota Story 2: Still Winning the Productivity Game , 2000 .

[83]  Gérard Baglin,et al.  L'entreprise LEAN Production ou la PME compétitive par l'action collective , 2000 .

[84]  John Paul MacDuffie,et al.  After Lean Production: Evolving Employment Practices in the World Auto Industry@@@The Fallacy of Flexibility: Workplace Change in the Queensland Open-Cut Coal Industry@@@Unions in a Contrary World: The Future of the Australian Trade Union Movement , 1998 .

[85]  J. Dean,et al.  MANAGEMENT THEORY AND TOTAL QUALITY: IMPROVING RESEARCH AND PRACTICE THROUGH THEORY DEVELOPMENT , 1994 .

[86]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[87]  R. Schonberger Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .

[88]  Maurice Pillet,et al.  A method to identify critical resources: Illustration by an industrial case. , 2008 .

[89]  Ben J. Hicks,et al.  Lean information management: Understanding and eliminating waste , 2007, Int. J. Inf. Manag..

[90]  Leonardo Rivera,et al.  Measuring the impact of Lean tools on the cost-time investment of a product using cost-time profiles , 2007 .

[91]  Matthias Holweg,et al.  The genealogy of lean production , 2007 .

[92]  Henri Savall,et al.  Maîtriser les Coûts et les Performances Cachés 5e édition , 2010 .

[93]  C. Carl Pegels The Toyota Production System — Lessons for American Management , 1984 .

[94]  Henri Savall,et al.  Maîtriser les coûts et les performances cachés , 2013 .

[95]  新郷 重夫 Maîtrise de la production et méthode Kanban : le cas Toyota , 1983 .

[96]  R. McAdam,et al.  A business excellence approach to generic benchmarking in SMEs , 2002 .

[97]  Jean-Luc Maire,et al.  A typology of “best practices” for a benchmarking process , 2005 .

[98]  Arnoldo C. Hax,et al.  Strategic Management: An Integrative Perspective , 1984 .

[99]  Ifechukwude K. Dibia,et al.  Lean Revolution and the Human Resource Aspects , 2010 .

[100]  Paul Lillrank,et al.  The Transfer of Management Innovations from Japan , 1995 .

[101]  Vincent Giard,et al.  Le passage de l'approvisionnement synchrone à la production synchrone dans la chaîne logistique , 2004 .

[102]  Georges Friedmann,et al.  Problèmes humains du machinisme industriel , 1954 .

[103]  William J. Doll,et al.  Developing measures of time-based manufacturing , 1998 .

[104]  Barbara Lyonnet,et al.  An approach to identify critical resources: an industrial case study , 2010 .

[105]  P. Bruun,et al.  Lean production and the Internet , 2004 .

[106]  Colin Herron,et al.  The transfer of selected lean manufacturing techniques from Japanese automotive manufacturing into general manufacturing (UK) through change agents , 2008 .

[107]  G. Derringer,et al.  Simultaneous Optimization of Several Response Variables , 1980 .

[108]  M. Pillet,et al.  Une première étape vers le Lean dans les entreprises de sous-traitance mécanique (Retour sur 7 ans de pratique) , 2007 .

[109]  M. Z. Babai Politiques de pilotage de flux dans les chaînes logistiques : impact de l'utilisation des prévisions sur la gestion de stocks , 2005 .

[110]  R. Schroeder,et al.  Relationships between implementation of TQM, JIT, and TPM and manufacturing performance , 2001 .

[111]  Colin Herron,et al.  A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies , 2006 .

[112]  J. Antonakis,et al.  Could lean production job design be intrinsically motivating? Contextual, configurational, and levels-of-analysis issues , 2006 .