A Survey of Scheduling Rules
暂无分享,去创建一个
[1] James R. Jackson,et al. Simulation research on job shop production , 1957 .
[2] Roger L. Sisson,et al. Methods of Sequencing in Job Shops---A Review , 1959 .
[3] Ross T. Nelson,et al. A PRE-COMPUTATIONAL REPORT ON JOB SHOP SIMULATION RESEARCH , 1959 .
[4] C. T. Baker,et al. Simulation of a Simplified Job Shop , 1960 .
[5] William L. Maxwell,et al. Network Dispatching by the Shortest-Operation Discipline , 1962 .
[6] Richard Walter Conway,et al. An Experimental Investigation of Priority Assignment in a Job Shop , 1964 .
[7] J. William Gavett,et al. Three Heuristic Rules for Sequencing Jobs to a Single Production Facility , 1965 .
[8] William S. Gere. Heuristics in Job Shop Scheduling , 1966 .
[9] John L. Colley,et al. Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System , 1966 .
[10] Colin L. Moodie,et al. EXPERIMENTS WITH PRIORITY DISPATCHING RULES IN A PARALLEL PROCESSOR SHOP , 1967 .
[11] R. M. Hodgson,et al. JOB SHOPS SCHEDULING WITH DUE DATES , 1967 .
[12] R. H. Hollier. A Simulation Study of Sequencing in Batch Production , 1968 .
[13] Samuel Eilon,et al. A MODIFIED SI RULE IN JOB SHOP SCHEDULING , 1968 .
[14] William L. Maxwell,et al. Multiple‐factor rules for sequencing with assembly constraints , 1968 .
[15] Robert G. Brown. Simulations to explore alternative sequencing rules , 1968 .
[16] Jon K. Wilbrecht,et al. The Influence of Setup Time on Job Shop Performance , 1969 .
[17] A. Alan B. Pritsker,et al. Sequencing n Products Involving m Independent Jobs on m Machines , 1971 .
[18] Bruce A. McCarl,et al. An investigation of a cost-based rule for job-shop scheduling , 1973 .
[19] John S. Fryer. Operating Policies in Multiechelon Dual-Constraint Job Shops , 1973 .
[20] C. A. Komar,et al. The Effectiveness of Three Heuristic Rules for Job Sequencing in a Single Production Facility , 1973 .
[21] C. Jones. An Economic Evaluation of Job Shop Dispatching Rules , 1973 .
[22] Charles A. Holloway,et al. Job Shop Scheduling with Due Dates and Variable Processing Times , 1974 .
[23] Jon Frye. Labor Flexibility in Multiechelon Dual-Constraint Job Shops , 1974 .