Factors governing construction project delivery selection: A content analysis

Abstract Comprehensively identifying factors governing project delivery system (PDS) selection is crucial for construction projects. This paper aims at constructing a holistic system of governing factors. Based on review of previous studies, project condition factors and performance objective factors were identified to construct the factor system. To explore the perspective divergences, content analyses on Chinese and developed countries' literature were performed. The emphasizing frequencies of factors were calculated. T tests were performed to compare the relative importance of factors. Principal component analysis was employed to identify key factors. The results show that three groups of factors, namely, internal project conditions, external project conditions and project performance objective factors are the main factors governing PDS selection. Some factors are of different importance in China and developed countries, mirroring the management maturity and philosophy gaps. The proposed factor system acts as a guidance to PDS selection and lays solid foundation for future studies.

[1]  C. William Ibbs,et al.  Determinants of international architectural, engineering, and construction firms' project success in China , 2006 .

[2]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .

[3]  I. Jolliffe Principal Component Analysis , 2002 .

[4]  Stephen O. Ogunlana,et al.  Construction professionals' perception of critical success factors for large‐scale construction projects , 2009 .

[5]  Kumar Neeraj Jha,et al.  Identification and evaluation of success factors for public construction projects , 2011 .

[6]  Qiping Shen,et al.  Which Owner Characteristics Are Key Factors Affecting Project Delivery System Decision Making? Empirical Analysis Based on the Rough Set Theory , 2015 .

[7]  Lin Zhenghang Study on classification of owner-consultant structure for engineering projects , 2010 .

[8]  Nur Emma Mustaffa,et al.  Critical success factors for Malaysian construction projects: an empirical assessment , 2013 .

[9]  R. Edward Minchin,et al.  Owners Respond: Preferences for Task Performance, Delivery Systems, and Quality Management , 2010 .

[10]  TaeHoon Hong,et al.  Effect of project characteristics on project performance in construction projects based on structural equation model , 2009, Expert Syst. Appl..

[11]  Fernando Tobal Berssaneti,et al.  Identification of variables that impact project success in Brazilian companies , 2015 .

[12]  Ibrahim M. Mahdi,et al.  Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .

[13]  P. He,et al.  The effectiveness of contractual and relational governances in construction projects in China , 2015 .

[14]  M. K. Parfitt,et al.  Checklist of critical success factors for building projects , 1993 .

[15]  Stephen O. Ogunlana,et al.  Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry , 2008 .

[16]  Andrew W Gale,et al.  The development and delivery of an industry led project management professional development programme: A case study in project management education and success management , 2008 .

[17]  Tianji Xu,et al.  Development Model for Competitive Construction Industry in the People’s Republic of China , 2005 .

[18]  Yoki M. W. Wong,et al.  Factors influencing the success of PPP at feasibility stage – A tripartite comparison study in Hong Kong , 2012 .

[19]  S. Thomas Ng,et al.  Parameters governing the selection of procurement system – an empirical survey , 2003 .

[20]  Florence T. T. Phua Modelling the determinants of multi‐firm project success: a grounded exploration of differing participant perspectives , 2004 .

[21]  Mohammed I Al Khalil,et al.  Selecting the appropriate project delivery method using AHP , 2002 .

[22]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .

[23]  Chen-yu Chang,et al.  The principle of inconsistent trinity in the selection of procurement systems , 2007 .

[24]  Mohan M. Kumaraswamy,et al.  Linking procurement systems to project priorities , 1998 .

[25]  S. M. Rowlinson,et al.  Organizational structures in the construction industry , 1996 .

[26]  Nur Emma Mustaffa,et al.  Analysis of factors critical to construction project success in Malaysia , 2012 .

[27]  Martin Skitmore,et al.  Which procurement system? Towards a universal procurement selection technique , 1988 .

[28]  Janita F. J. Vos,et al.  Investigating the use of the stakeholder notion in project management literature, a meta-analysis , 2008 .

[29]  Y. C. Kog,et al.  Critical Success Factors for Different Project Objectives , 1999 .

[30]  Sai On Cheung,et al.  Improving objectivity in procurement selection , 2001 .

[31]  Liyin Shen,et al.  Research on the phenomenon of asymmetric information in construction projects — The case of China , 2015 .

[32]  Junying Liu,et al.  Interrelationships among Critical Success Factors of Construction Projects Based on the Structural Equation Model , 2012 .

[33]  Zhuo-fu Wang,et al.  Selection of Construction Project Delivery Method Based on Value-Added Analysis: A Theoretical Framework , 2013 .

[34]  Keith R. Molenaar,et al.  Selection of Project Delivery Method in Transit: Drivers and Objectives , 2011 .

[35]  Binshan Lin,et al.  Project delivery system selection of construction projects in China , 2011, Expert Syst. Appl..

[36]  Qian Shi,et al.  Delivery risk analysis within the context of program management using fuzzy logic and DEA: A China case study , 2014 .

[37]  P. Love,et al.  Procurement of construction facilities in Guangdong Province, China: factors influencing the choice of procurement method , 2004 .

[38]  Anil Sawhney,et al.  Structural equation model for assessing impacts of contractor's performance on project success , 2011 .

[39]  Stephen O. Ogunlana,et al.  A study on project success factors in large construction projects in Vietnam , 2004 .

[40]  Heap-Yih Chong,et al.  Improving construction procurement systems using organizational strategies , 2014 .

[41]  Pantaleo Mutajwaa Daniel Rwelamila,et al.  Project Procurement Competence and Knowledge Base of Civil Engineering Consultants: An Empirical Study , 2007 .

[42]  Colin Duffield,et al.  Incentives in the Chinese construction industry , 2008 .

[43]  Mohan M. Kumaraswamy,et al.  Developing a decision support system for building project procurement , 2001 .

[44]  Peter E.D. Love,et al.  Participatory Action Research Approach to Public Sector Procurement Selection , 2012 .

[45]  Caroline T. W. Chan Fuzzy procurement selection model for construction projects , 2007 .

[46]  S. Thomas Ng,et al.  Fuzzy membership functions of procurement selection criteria , 2002 .

[47]  Andrew D.F. Price,et al.  The effect of integration on project delivery team effectiveness , 2011 .

[48]  Bo-Christer Björk,et al.  Where to submit? Journal choice by construction management authors , 2008 .

[49]  Hong Ke,et al.  Research on Influencing Factors Index System for Selecting a Project Delivery System , 2013 .

[50]  Ralf Wilden,et al.  Multi-level project governance: Trends and opportunities , 2014 .

[51]  Florence Yean Yng Ling,et al.  Predicting Performance of Design-Build and Design-Bid-Build Projects , 2004 .

[52]  Kumar Neeraj Jha,et al.  Success Traits for a Construction Project , 2012 .

[53]  Chen-Yu Chang,et al.  Rethinking the multi-attribute utility approach based procurement route selection technique , 2002 .

[54]  James G. Combs,et al.  Does human capital matter? A meta-analysis of the relationship between human capital and firm performance. , 2011, The Journal of applied psychology.

[55]  Christopher M. Gordon,et al.  Choosing Appropriate Construction Contracting Method , 1994 .

[56]  Will Hughes Identifying the environments of construction projects , 1989 .

[57]  C. William Ibbs,et al.  Alternative methods for choosing an appropriate project delivery system (PDS) , 2011 .

[58]  Munib Ahmad Asif Critical success factor for different project objectives , 2003 .

[59]  Stuart D. Anderson,et al.  Relative Effectiveness of Project Delivery and Contract Strategies , 2006 .

[60]  Yong-Woo Kim,et al.  The Relationship Between Delivery Processes and Transportation Projects Performance , 2012 .

[61]  Peter E.D. Love,et al.  Partnering research in construction , 2000 .

[62]  S. Thomas Ng,et al.  A case-based procurement advisory system for construction , 2003 .

[63]  T. Alhazmi,et al.  Project Procurement System Selection Model , 2000 .

[64]  Lee Yong Tay,et al.  Factors Influencing The Selection Of Procurement Systems By Clients , 2006 .

[65]  Ping Chen,et al.  Project Management in the Chinese Construction Industry: Six-Case Study , 2009 .

[66]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[67]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[68]  Marcus Jefferies,et al.  A strategy for evaluating a fuzzy case-based construction procurement selection system , 2006, Adv. Eng. Softw..

[69]  Jung-Ho Yu,et al.  Critical success factors for urban regeneration projects in Korea , 2011 .

[70]  Liu Xiao-jun,et al.  Application of Entropy Measurement in Risk Assessment of the Engineering Project of Construction-agent System , 2011 .

[71]  Ning Zhang,et al.  Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA) , 2010 .