Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach
暂无分享,去创建一个
[1] Ming-Hon Hwang,et al. Replenishment lot sizing with failure in rework and an enhanced multi-shipment policy , 2014 .
[2] Singa Wang Chiu,et al. Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule , 2013 .
[3] Singa Wang Chiu,et al. Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..
[4] Adam Janiak,et al. Batching work and rework processes with limited deterioration of reworkables , 2006, Comput. Oper. Res..
[5] Singa Wang Chiu,et al. Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown , 2013 .
[6] M. N. Gopalan,et al. Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and Rework , 1994 .
[7] Yuan-Shyi Peter Chiu,et al. Solving an economic production lot size problem with multi-delivery policy and quality assurance using an algebraic approach , 2010 .
[8] Navonil Mustafee,et al. A game-based approach towards facilitating decision making for perishable products: An example of blood supply chain , 2014, Expert Syst. Appl..
[9] Awi Federgruen,et al. Determining Production Schedules Under Base-Stock Policies in Single Facility Multi-Item Production Systems , 1998, Oper. Res..
[10] Bernard Kamsu-Foguem,et al. Mining association rules for the quality improvement of the production process , 2013, Expert Syst. Appl..
[11] M A Rahim,et al. Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products , 2001, J. Oper. Res. Soc..
[12] Mehdi Safaei,et al. An integrated multi-objective model for allocating the limited sources in a multiple multi-stage lean supply chain , 2014 .
[13] E. Silver,et al. A heuristic solution procedure for the multi-item, single-level, limited capacity, lot-sizing problem , 1981 .
[14] Hong-Dar Lin,et al. A note on "intra-supply chain system with multiple sales locations and quality assurance" , 2013, Expert Syst. Appl..
[15] Singa Wang Chiu,et al. Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .
[16] Manickam Murugan,et al. Productivity improvement in manufacturing submersible pump diffuser housing using lean manufacturing system , 2014 .
[17] M. D. Byrne. Multi-item production lot sizing using a search simulation approach , 1990 .
[18] James A. Rodger,et al. Application of a Fuzzy Feasibility Bayesian Probabilistic Estimation of supply chain backorder aging, unfilled backorders, and customer wait time using stochastic simulation with Markov blankets , 2014, Expert Syst. Appl..
[19] Eric Sucky,et al. Inventory management in supply chains: A bargaining problem , 2005 .
[20] Anthony J. Zahorik,et al. Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems , 1984 .
[21] Candace Arai Yano,et al. The economic lot and delivery scheduling problem: The single item case , 1992 .
[22] Singa Wang Chiu,et al. Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework , 2012, Expert Syst. Appl..
[23] Kenji Muramatsu,et al. A Near-Optimal Solution Method of Multi-Item Multi-Process Dynamic Lot Size Scheduling Problem , 2003 .
[24] M. Darwish,et al. The joint economic lot sizing problem: Review and extensions , 2008, Eur. J. Oper. Res..
[25] Edward A. Silver,et al. The multi-item newsvendor problem with a budget constraint and fixed ordering costs , 2000, J. Oper. Res. Soc..
[26] Jafar Rezaei,et al. A deterministic, multi-item inventory model with supplier selection and imperfect quality , 2008 .
[27] Hong-Dar Lin,et al. A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging , 2008, Comput. Math. Appl..
[28] Ming-Hon Hwang,et al. Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework , 2013 .
[29] Jens Clausen,et al. A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case , 2006, Eur. J. Oper. Res..
[30] Y. Chiu,et al. Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate , 2013 .
[31] Mei-fang Wu,et al. Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy , 2014 .
[32] Roger M. Hill,et al. The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .
[33] V. Aggarwal. Grouping multi-item inventory using common cycle periods , 1984 .