Investigating the relationship between planning reliability and project performance
暂无分享,去创建一个
[1] Joao Auada Junior,et al. Last Planner as a Site Operations Tool , 1998 .
[2] Russell Kenley. Proceedings of the 13th Annual Conference of the International Group for Lean Construction, Sydney, New South Wales, Australia, 19-21 July 2005 , 2005 .
[3] Michael J Horman. Process dynamics : buffer management in building project operations , 2000 .
[4] Luis F. Alarcón,et al. INVESTIGATING THE RELATIONSHIP BETWEEN PLANNING RELIABILITY AND PROJECT PERFORMANCE: A CASE STUDY , 2007 .
[5] Antonio Sergio Itri Conte. Last Planner, Look Ahead, PPC: a Driver to the Site Operations , 1998 .
[6] Gregory A. Howell,et al. SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .
[7] Leonhard E. Bernold,et al. Placement‐Oriented Design and Delivery of Concrete Reinforcement , 1993 .
[8] Jacob Cohen. Statistical Power Analysis for the Behavioral Sciences , 1969, The SAGE Encyclopedia of Research Design.
[9] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[10] Russell L. Purvis,et al. Project Management under Uncertainty: The Impact of Heuristics and Biases , 2002 .
[11] Glenn Ballard,et al. LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL , 1997 .
[12] Luis F. Alarcón,et al. Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule , 1999 .
[13] David Kh Chua,et al. Impact of Variability on Construction Schedules , 2005 .
[14] Greg Howell,et al. Implementing Lean Construction: Stabilizing Work Flow , 1997 .
[15] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[16] Glenn Ballard,et al. PARC: A Case Study , 1996 .
[17] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[18] Iris D. Tommelein,et al. Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle , 2003 .
[19] Glenn Ballard,et al. Lean construction and EPC performance improvement , 1997 .
[20] Luis F. Alarcón,et al. Assessing the Impacts of Implementing Lean Construction , 2008 .
[21] Sven Bertelsen,et al. COMPLEXITY – CONSTRUCTION IN A NEW PERSPECTIVE , 2003 .
[22] Feniosky Peña-Mora,et al. DYNAMIC PLANNING AND CONTROL METHODOLOGY FOR DESIGN/BUILD FAST-TRACK CONSTRUCTION PROJECTS , 2001 .
[23] Ivica Završki,et al. Reducing Variability to Improve Performance as a Lean Construction Principle , 2002 .
[24] Tariq S. Abdelhamid,et al. Comparing Process Improvement Initiatives Based on Percent Plan Complete and Labour Utilization Factors , 2003 .
[25] Gregory A. Howell,et al. Factors affecting project success in the piping function , 1997 .
[26] Gregory A. Howell,et al. Interaction between subcycles: one key to improved methods , 1993 .
[27] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[28] C. MarioFiallo,et al. Applying the Last Planner Control System to a Construction Project - A Case Study in Quito, Ecuador , 2002 .