A hybrid approach to sequencing jobs using heuristic rules and neural networks
暂无分享,去创建一个
[1] Marc M. Van Hulle. A Goal Programming Network for Mixed Integer Linear Programming: a CaseStudy for the Job-Shop Scheduling Problem , 1991, Int. J. Neural Syst..
[2] J. P. Mason,et al. Industrial Applications of Neural Networks: Project ANNIE Handbook , 1992 .
[3] J J Hopfield,et al. Neural networks and physical systems with emergent collective computational abilities. , 1982, Proceedings of the National Academy of Sciences of the United States of America.
[4] Geoffrey E. Hinton,et al. Learning internal representations by error propagation , 1986 .
[5] Ram Mohan V. Rachamadugu,et al. Technical Note - A Note on the Weighted Tardiness Problem , 1987, Oper. Res..
[6] James P. Ignizio,et al. A stochastic neural network for resource constrained scheduling , 1992, Comput. Oper. Res..
[7] Ari P. J. Vepsalainen. Priority rules for job shops with weighted tardiness costs , 1987 .
[8] Ram Rachamadugu,et al. Real-time scheduling of an automated manufacturing center * , 1989 .
[9] Chris N. Potts,et al. Single Machine Tardiness Sequencing Heuristics , 1991 .
[10] Anders Krogh,et al. Introduction to the theory of neural computation , 1994, The advanced book program.
[11] Kenneth R. Baker,et al. Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .
[12] Yuehwern Yih,et al. ROBOT SCHEDULING IN A CIRCUIT BOARD PRODUCTION LINE:A HYBRID OR/ANN APPROACH , 1993 .
[13] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[14] Akio Yamamoto,et al. Scheduling for minimizing total actual flow time by neural networks , 1992 .
[15] William L. Maxwell,et al. Theory of scheduling , 1967 .
[16] E. Lawler. A “Pseudopolynomial” Algorithm for Sequencing Jobs to Minimize Total Tardiness , 1977 .
[17] James L. McClelland,et al. Parallel distributed processing: explorations in the microstructure of cognition, vol. 1: foundations , 1986 .
[18] Richard P. Lippmann,et al. An introduction to computing with neural nets , 1987 .