Robustness of Forecast-Based Monitoring Schemes
暂无分享,去创建一个
[1] Fah Fatt Gan,et al. An optimal design of CUSUM quality control charts , 1991 .
[2] Douglas C. Montgomery,et al. Some Statistical Process Control Methods for Autocorrelated Data , 1991 .
[3] E. S. Page. CONTINUOUS INSPECTION SCHEMES , 1954 .
[4] W. J. Padgett,et al. On the α-risks for shewhart control charts , 1992 .
[5] T. Harris,et al. Statistical process control procedures for correlated observations , 1991 .
[6] Herbert Moskowitz,et al. Run-Length Distributions of Special-Cause Control Charts for Correlated Processes , 1994 .
[7] Donald J. Wheeler,et al. Detecting a Shift in Process Average: Tables of the Power Function for X Charts , 1983 .
[8] Benjamin M. Adams,et al. Monitoring autocorrelated processes with an exponentially weighted moving average forecast , 1994 .
[9] Richard A. Johnson,et al. The Effect of Serial Correlation on the Performance of CUSUM Tests II , 1974 .
[10] Benjamin M. Adams,et al. Combined Control Charts for Forecast-Based Monitoring Schemes , 1996 .
[11] E. S. Page. CONTROL CHARTS WITH WARNING LINES , 1955 .
[12] William H. Woodall,et al. The effect of autocorrelation on the retrospective X-chart , 1992 .
[13] Stephen V. Crowder,et al. Design of Exponentially Weighted Moving Average Schemes , 1989 .
[14] William H. Woodall,et al. Performance of the Control Chart Trend Rule under Linear Shift , 1988 .