The extended GWMA control chart
暂无分享,去创建一个
[1] Shey-Huei Sheu,et al. The Generally Weighted Moving Average Control Chart for Detecting Small Shifts in the Process Mean , 2003 .
[2] James M. Lucas,et al. Exponentially weighted moving average control schemes: Properties and enhancements , 1990 .
[3] S. Crowder. A simple method for studying run-length distribution of exponentially weighted moving average charts , 1987 .
[4] S. Steiner. EWMA Control Charts with Time-Varying Control Limits and Fast Initial Response , 1999 .
[5] Gemai Chen,et al. An Extended EWMA Mean Chart , 2005 .
[6] Shey-Huei Sheu,et al. Optimal number of minimal repairs before replacement of a system subject to shocks , 1996 .
[7] Stephen V. Crowder,et al. Design of Exponentially Weighted Moving Average Schemes , 1989 .
[8] Shey-Huei Sheu,et al. Extended optimal replacement model for deteriorating systems , 1999, Eur. J. Oper. Res..
[9] Shey-Huei Sheu,et al. A generalized age and block replacement of a system subject to shocks , 1998, Eur. J. Oper. Res..
[10] P. Robinson,et al. Average Run Lengths of Geometric Moving Average Charts by Numerical Methods , 1978 .
[11] Marcus B. Perry,et al. The Exponentially Weighted Moving Average , 2010 .
[12] S. W. Roberts,et al. Control Chart Tests Based on Geometric Moving Averages , 2000, Technometrics.