Multi-Station Equivalents for Short-Term Hydropower Scheduling

Hydropower scheduling in day-ahead electricity markets is complex due to uncertainty in the electricity price. Internal cascade dependency of hydro power plants can also increase this complexity. One way to overcome this complexity is to replace the original hydropower system by an equivalent system, which provides simulation results sufficiently close to the ones of the original system. This paper presents a method to obtain multi-station equivalent models using a bilevel optimization problem, where the objective is to minimize the difference in outcomes between the original and the equivalent models. This bilevel problem is then transformed into a single-level optimization problem that can be solved using standard optimization techniques. Finally, the errors between the simulation results of the original and equivalent hydropower models are computed and analyzed for a Swedish system to show the accuracy of different multi-station equivalents.

[1]  Xiaohong Guan,et al.  An MILP Based Formulation for Short-Term Hydro Generation Scheduling With Analysis of the Linearization Effects on Solution Feasibility , 2013, IEEE Transactions on Power Systems.

[2]  B. Hobbs,et al.  Complementarity Modeling in Energy Markets , 2012 .

[3]  K. Moslehi,et al.  Stochastic Long-Term Hydrothermal Optimization for a Multireservoir System , 1985, IEEE Power Engineering Review.

[4]  S. Jones Home and away with Norwegian hydro , 2000 .

[5]  Antonio J. Conejo,et al.  Medium-Term Power Dispatch in Predominantly Hydro Systems: An Equilibrium Approach , 2013, IEEE Transactions on Power Systems.

[6]  G. Sanchez,et al.  Optimal Operation of Multireservoir Systems Using an Aggregation-Decomposition Approach , 1985, IEEE Power Engineering Review.

[7]  Stephen J. Wright,et al.  Some properties of regularization and penalization schemes for MPECs , 2004, Optim. Methods Softw..

[8]  G. da Cruz,et al.  Nonuniform composite representation of hydroelectric systems for long-term hydrothermal scheduling , 1995 .

[9]  J. Waight,et al.  Experiences with Mixed Integer Linear Programming-Based Approaches in Short-Term Hydro Scheduling , 2001, IEEE Power Engineering Review.

[10]  Yong-Gang Wu,et al.  A diploid genetic approach to short-term scheduling of hydro-thermal system , 2000 .

[11]  Jakob Rosing,et al.  Composite Representation of a Multireservoir Hydroelectric Power System , 1970 .

[12]  Zachary B. Sharp,et al.  International Water Power & Dam Construction , 2014 .

[13]  Nicolaos V. Arvanitidis,et al.  Optimal Operation of Multireservoir Systems Using a Composite Representation , 1970 .

[14]  João Luiz Boccia Brandão Performance of the Equivalent Reservoir Modelling Technique for Multi-Reservoir Hydropower Systems , 2010 .

[15]  M. Ulbrich,et al.  A New Relaxation Scheme for Mathematical Programs with Equilibrium Constraints , 2010, SIAM J. Optim..

[16]  S. Gabriel,et al.  An SOS1-Based Approach for Solving MPECs with a Natural Gas Market Application , 2013 .

[17]  A. Borghetti,et al.  An MILP Approach for Short-Term Hydro Scheduling and Unit Commitment With Head-Dependent Reservoir , 2008, IEEE Transactions on Power Systems.

[18]  Antonio J. Conejo,et al.  Self-Scheduling of a Hydro Producer in a Pool-Based Electricity Market , 2002, IEEE Power Engineering Review.

[19]  I. Grossmann,et al.  On the Computational Studies of Deterministic Global Optimization of Head Dependent Short-Term Hydro Scheduling , 2013, IEEE Transactions on Power Systems.

[20]  Gui-Hua Lin,et al.  A Modified Relaxation Scheme for Mathematical Programs with Complementarity Constraints , 2002, Ann. Oper. Res..

[21]  C. Li,et al.  Stochastic optimization of interconnected multireservoir power systems , 1989, Conference Papers Power Industry Computer Application Conference.

[22]  M.E.P. Maceira,et al.  A Four-Dimensional Model of Hydro Generation for the Short-Term Hydrothermal Dispatch Problem Considering Head and Spillage Effects , 2008, IEEE Transactions on Power Systems.

[23]  M. Amelin,et al.  A sensitivity analysis of short-term hydropower planning using stochastic programming , 2012, 2012 IEEE Power and Energy Society General Meeting.

[24]  A. Conejo,et al.  Pool Strategy of a Producer With Endogenous Formation of Locational Marginal Prices , 2009, IEEE Transactions on Power Systems.

[25]  Hugh Rudnick,et al.  Short-term hydrothermal generation scheduling model using a genetic algorithm , 2003 .

[26]  Lennart Söder,et al.  Two-station equivalent of hydro power systems , 2005 .