The stochastic U‐line balancing problem
暂无分享,去创建一个
[1] M. Held,et al. Assembly-Line Balancing---Dynamic Programming with Precedence Constraints , 1963 .
[2] Moshe Sniedovich. Analysis of a Preference Order Assembly Line Problem , 1981 .
[3] Katsuhisa Ohno,et al. ANALYSIS AND OPTIMIZATION OF A U-SHAPED PRODUCTION LINE , 1997 .
[4] Edward P. C. Kao,et al. On Dynamic Programming Methods for Assembly Line Balancing , 1982, Oper. Res..
[5] Soumen Ghosh,et al. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .
[6] Ilker Baybars,et al. A survey of exact algorithms for the simple assembly line balancing , 1986 .
[7] J. Scott Provan,et al. The Complexity of Counting Cuts and of Computing the Probability that a Graph is Connected , 1983, SIAM J. Comput..
[8] David Sparling. Balancing Just-In-Time Production Units: The N U-Line Balancing Problem , 1998 .
[9] Roger G. Schroeder,et al. Operations Management: Contemporary Concepts and Cases , 1999 .
[10] Edward P. C. Kao. A Preference Order Dynamic Program for Stochastic Assembly Line Balancing , 1976 .
[11] K. Knott. A Study of Work-Time Distributions on Unpaced Tasks , 1987 .
[12] John B. Kidd,et al. Toyota Production System , 1993 .
[13] John Miltenburg,et al. Balancing U-lines in a multiple U-line facility , 1998, Eur. J. Oper. Res..
[14] Katsuhisa Ohno,et al. An optimal worker allocation problem for a U-shaped production line , 1999 .
[15] John Miltenburg,et al. U-shaped production lines: A review of theory and practice , 2001 .
[16] J. L. C. Macaskill,et al. Production-Line Balances for Mixed-Model Lines , 1972 .
[17] Mordechai I. Henig. Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems , 1986, Comput. Oper. Res..
[18] Nick T. Thomopoulos,et al. Mixed Model Line Balancing with Smoothed Station Assignments , 1970 .
[19] Fred N. Silverman,et al. A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages , 1986 .
[20] Thomas R. Hoffman. Eureka: a hybrid system for assembly line balancing , 1992 .
[21] J. Wijngaard,et al. The U-line balancing problem , 1994 .
[22] Katsuhisa Ohno,et al. Stochastic analysis of a U-shaped production line with multiple workers , 1997 .
[23] Linus Schrage,et al. Dynamic Programming Solution of Sequencing Problems with Precedence Constraints , 1978, Oper. Res..
[24] George L. Nemhauser,et al. An Algorithm for the Line Balancing Problem , 1964 .
[25] Jrjung Lyu. A single-run optimization algorithm for stochastic assembly line balancing problems , 1997 .
[26] Roger V. Johnson,et al. Optimally balancing large assembly lines with `FABLE' , 1988 .
[27] Steven T. Hackman,et al. Fast, Effective Algorithms for Simple Assembly Line Balancing Problems , 1989, Oper. Res..
[28] Robert L. Carraway,et al. A dynamic programming approach to stochastic assembly line balancing , 1989 .
[29] Timothy L. Urban,et al. Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .
[30] William V. Gehrlein,et al. A comparative evaluation of heuristic line balancing techniques , 1986 .