The stochastic U‐line balancing problem

A U-line arranges tasks around a U-shaped production line and organizes them into stations that can cross from one side of the line to the other. In addition to improving visibility and communication between operators on the line, which facilitates problem-solving and quality improvement, U-lines can reduce the total number of operators required on the line and make rebalancing the line easier compared to the traditional, straight production line. This paper studies the (type 1) U-line balancing problem when task completion times are stochastic. Stochastic completion times occur when differences between operators cause completion times to vary somewhat and when machine processing times vary. A recursive algorithm is presented for finding the optimal solution when completion times have any distribution function. An equivalent shortest path network is also presented. An improvement for the special case of normally distributed task completion times is given. A computational study to determine the characteristics of instances that can be solved by the algorithms shows that they are able to solve instances of practical size (like the 114 Japanese and U.S. U-lines studied in a literature review paper). © 2002 Wiley Periodicals, Inc. Naval Research Logistics, 2003

[1]  M. Held,et al.  Assembly-Line Balancing---Dynamic Programming with Precedence Constraints , 1963 .

[2]  Moshe Sniedovich Analysis of a Preference Order Assembly Line Problem , 1981 .

[3]  Katsuhisa Ohno,et al.  ANALYSIS AND OPTIMIZATION OF A U-SHAPED PRODUCTION LINE , 1997 .

[4]  Edward P. C. Kao,et al.  On Dynamic Programming Methods for Assembly Line Balancing , 1982, Oper. Res..

[5]  Soumen Ghosh,et al.  A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .

[6]  Ilker Baybars,et al.  A survey of exact algorithms for the simple assembly line balancing , 1986 .

[7]  J. Scott Provan,et al.  The Complexity of Counting Cuts and of Computing the Probability that a Graph is Connected , 1983, SIAM J. Comput..

[8]  David Sparling Balancing Just-In-Time Production Units: The N U-Line Balancing Problem , 1998 .

[9]  Roger G. Schroeder,et al.  Operations Management: Contemporary Concepts and Cases , 1999 .

[10]  Edward P. C. Kao A Preference Order Dynamic Program for Stochastic Assembly Line Balancing , 1976 .

[11]  K. Knott A Study of Work-Time Distributions on Unpaced Tasks , 1987 .

[12]  John B. Kidd,et al.  Toyota Production System , 1993 .

[13]  John Miltenburg,et al.  Balancing U-lines in a multiple U-line facility , 1998, Eur. J. Oper. Res..

[14]  Katsuhisa Ohno,et al.  An optimal worker allocation problem for a U-shaped production line , 1999 .

[15]  John Miltenburg,et al.  U-shaped production lines: A review of theory and practice , 2001 .

[16]  J. L. C. Macaskill,et al.  Production-Line Balances for Mixed-Model Lines , 1972 .

[17]  Mordechai I. Henig Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems , 1986, Comput. Oper. Res..

[18]  Nick T. Thomopoulos,et al.  Mixed Model Line Balancing with Smoothed Station Assignments , 1970 .

[19]  Fred N. Silverman,et al.  A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages , 1986 .

[20]  Thomas R. Hoffman Eureka: a hybrid system for assembly line balancing , 1992 .

[21]  J. Wijngaard,et al.  The U-line balancing problem , 1994 .

[22]  Katsuhisa Ohno,et al.  Stochastic analysis of a U-shaped production line with multiple workers , 1997 .

[23]  Linus Schrage,et al.  Dynamic Programming Solution of Sequencing Problems with Precedence Constraints , 1978, Oper. Res..

[24]  George L. Nemhauser,et al.  An Algorithm for the Line Balancing Problem , 1964 .

[25]  Jrjung Lyu A single-run optimization algorithm for stochastic assembly line balancing problems , 1997 .

[26]  Roger V. Johnson,et al.  Optimally balancing large assembly lines with `FABLE' , 1988 .

[27]  Steven T. Hackman,et al.  Fast, Effective Algorithms for Simple Assembly Line Balancing Problems , 1989, Oper. Res..

[28]  Robert L. Carraway,et al.  A dynamic programming approach to stochastic assembly line balancing , 1989 .

[29]  Timothy L. Urban,et al.  Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .

[30]  William V. Gehrlein,et al.  A comparative evaluation of heuristic line balancing techniques , 1986 .