Modeling a Contractor’s Markup Estimation

The estimation of markup is a difficult process for contractors in a changeable and uncertain construction environment. In this study, a fuzzy logic-based artificial neural network (ANN) model, called the fuzzy neural network (FNN) model, is constructed to assist contractors in making markup decisions. With the fuzzy logic inference system integrated inside, the FNN model provides users with a clear explanation to justify the rationality of the estimated markup output. Meanwhile, with the self-learning ability of ANN, the accuracy of the estimation results is improved. From a survey and interview with local contractors, the factors that affect markup estimation and the rules applied in the markup decision are identified. Based on the finding, both ANN and FNN models were constructed and trained in different project scenarios. The comparison of the two models shows that FNN will assist contractors with markup estimation with more accurate results and convincing user-defined linguistic rules inside.

[1]  Akintola Akintoye,et al.  A survey of current cost estimating practices in the UK , 2000 .

[2]  Miroslaw J. Skibniewski,et al.  Estimating construction productivity: neural-network-based approach , 1994 .

[3]  Peter E.D. Love,et al.  Combining rule-based expert systems and artificial neural networks for mark-up estimation , 1999 .

[4]  Goh Bee-Hua Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: the case of the Singapore residential sector , 2000 .

[5]  Ming Lu Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling , 2002 .

[6]  Jonathan Jingsheng Shi,et al.  A neural network based system for predicting earthmoving production , 1999 .

[7]  David Lowe,et al.  Data modelling and the application of a neural network approach to the prediction of total construction costs , 2002 .

[8]  A. Shash Factors considered in tendering decisions by top UK contractors , 1993 .

[9]  Trefor P. Williams Predicting completed project cost using bidding data , 2002 .

[10]  Tiesong Hu,et al.  A fuzzy neural network approach for contractor prequalification , 2001 .

[11]  Tarek Hegazy,et al.  Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression , 2003 .

[12]  Miroslaw J. Skibniewski,et al.  Neural Network Method of Estimating Construction Technology Acceptability , 1995 .

[13]  A. Thorpe,et al.  A survey of indirect cost estimating in practice , 1994 .

[14]  Ali A. Shash,et al.  The effect of contractor size on mark-up size decision in Saudi Arabia , 1993 .

[15]  Heng Li,et al.  Neural network models for intelligent support of mark‐up estimation , 1996 .

[16]  L. Seiford,et al.  Priority Ranking and Consensus Formation , 1978 .

[17]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[18]  Irtishad Ahmad,et al.  Questionnaire Survey on Bidding in Construction , 1988 .

[19]  Martyn Hammersley,et al.  Ethnography : Principles in Practice , 1983 .

[20]  Simon Haykin,et al.  Neural Networks: A Comprehensive Foundation , 1998 .

[21]  Ching-Lai Hwang,et al.  Multiple attribute decision making : an introduction , 1995 .

[22]  Richard de Neufville,et al.  Improving Contractors' Bids Using Preference Reversal Phenomenon , 1994 .

[23]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[24]  Irtishad Ahmad,et al.  Optimum mark-up for bidding: a preference-uncertainty trade off approach , 1987 .

[25]  Tarek Hegazy,et al.  Analogy‐Based Solution to Markup Estimation Problem , 1994 .

[26]  C. S. George Lee,et al.  Neural fuzzy systems: a neuro-fuzzy synergism to intelligent systems , 1996 .

[27]  Tarek Hegazy,et al.  Neural networks as tools in construction , 1991 .

[28]  James J. Buckley,et al.  Fuzzy neural network with fuzzy signals and weights , 1993, Int. J. Intell. Syst..

[29]  Ali A. Shash,et al.  Factors affecting a contractor's mark-up size decision in Saudi Arabia , 1992 .

[30]  H. Kuhn The Hungarian method for the assignment problem , 1955 .