Bridge Deterioration Prediction Using Markov-Chain Model Based on the Actual Repair Status in Shanghai

[1]  Sujeeva Setunge,et al.  Deterioration Prediction of Timber Bridge Elements Using the Markov Chain , 2013 .

[2]  George Morcous,et al.  Developing Deterioration Models for Nebraska Bridges , 2011 .

[3]  Anil K. Agrawal,et al.  Bridge Element Deterioration Rates , 2009 .

[4]  Huu Dung Tran,et al.  Investigation of deterioration models for stormwater pipe systems , 2007 .

[5]  George Morcous,et al.  Performance Prediction of Bridge Deck Systems Using Markov Chains , 2006 .

[6]  George Morcous,et al.  Computer Assistance in Managing the Maintenance of Low-Slope Roofs , 2003 .

[7]  G. Kuczera,et al.  Markov Model for Storm Water Pipe Deterioration , 2002 .

[8]  Hugh Hawk,et al.  The BRIDGIT Bridge Management System , 1998 .

[9]  Kamal Golabi,et al.  Pontis: A System for Maintenance Optimization and Improvement of US Bridge Networks , 1997 .

[10]  Samer Madanat,et al.  Estimation of infrastructure transition probabilities from condition rating data , 1995 .

[11]  David Veshosky,et al.  Comparative Analysis of Bridge Superstructure Deterioration , 1994 .

[12]  Xiaoming Chen,et al.  LIFE-CYCLE PERFORMANCE OF NEW YORK CITY BRIDGES , 1993 .

[13]  Erik H. Vanmarcke,et al.  Modeling Bridge Deterioration with Markov Chains , 1992 .

[14]  Samuel H Carpenter,et al.  PAVEMENT PERFORMANCE PREDICTION MODEL USING THE MARKOV PROCESS , 1987 .

[15]  J. L. Bogdanoff,et al.  A New Cumulative Damage Model—Part 4 , 1980 .

[16]  J. L. Bogdanoff A New Cumulative Damage Model: Part 1 , 1978 .

[17]  H. Grimm Parzen,E.: Stochastic Prozesses. Holden-Day, Inc., San Francisco,London, Amster dam 1962 (2. Nachdruck, Mai 1964). XI + 324 S., Preis $ 11,95 , 1967 .

[18]  Emanuel Parzen,et al.  Stochastic Processes , 1962 .