Bridge Deterioration Prediction Using Markov-Chain Model Based on the Actual Repair Status in Shanghai
暂无分享,去创建一个
Li Li | Feng Li | Zhang Chen | Lijun Sun | Feng Li | Lijun Sun | Zhang Chen | L. Li
[1] Sujeeva Setunge,et al. Deterioration Prediction of Timber Bridge Elements Using the Markov Chain , 2013 .
[2] George Morcous,et al. Developing Deterioration Models for Nebraska Bridges , 2011 .
[3] Anil K. Agrawal,et al. Bridge Element Deterioration Rates , 2009 .
[4] Huu Dung Tran,et al. Investigation of deterioration models for stormwater pipe systems , 2007 .
[5] George Morcous,et al. Performance Prediction of Bridge Deck Systems Using Markov Chains , 2006 .
[6] George Morcous,et al. Computer Assistance in Managing the Maintenance of Low-Slope Roofs , 2003 .
[7] G. Kuczera,et al. Markov Model for Storm Water Pipe Deterioration , 2002 .
[8] Hugh Hawk,et al. The BRIDGIT Bridge Management System , 1998 .
[9] Kamal Golabi,et al. Pontis: A System for Maintenance Optimization and Improvement of US Bridge Networks , 1997 .
[10] Samer Madanat,et al. Estimation of infrastructure transition probabilities from condition rating data , 1995 .
[11] David Veshosky,et al. Comparative Analysis of Bridge Superstructure Deterioration , 1994 .
[12] Xiaoming Chen,et al. LIFE-CYCLE PERFORMANCE OF NEW YORK CITY BRIDGES , 1993 .
[13] Erik H. Vanmarcke,et al. Modeling Bridge Deterioration with Markov Chains , 1992 .
[14] Samuel H Carpenter,et al. PAVEMENT PERFORMANCE PREDICTION MODEL USING THE MARKOV PROCESS , 1987 .
[15] J. L. Bogdanoff,et al. A New Cumulative Damage Model—Part 4 , 1980 .
[16] J. L. Bogdanoff. A New Cumulative Damage Model: Part 1 , 1978 .
[17] H. Grimm. Parzen,E.: Stochastic Prozesses. Holden-Day, Inc., San Francisco,London, Amster dam 1962 (2. Nachdruck, Mai 1964). XI + 324 S., Preis $ 11,95 , 1967 .
[18] Emanuel Parzen,et al. Stochastic Processes , 1962 .