Coordination of a three-level supply chain (supplier–manufacturer–retailer) with permissible delay in payments
暂无分享,去创建一个
[1] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[2] Kun-Jen Chung. Comments on the EOQ model under retailer partial trade credit policy in the supply chain , 2008 .
[3] J. Teng. Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers , 2009 .
[4] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[5] Simone Zanoni,et al. A note on an industrial strategy for stock management in supply chains: modelling and performance evaluation , 2004 .
[6] Robert W. Grubbström,et al. The EOQ with backlogging derived without derivatives , 1999 .
[7] R. Hill. The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .
[8] C. Glock. The joint economic lot size problem: A review , 2012 .
[9] R. Higgins,et al. Inventory Policy and Trade Credit Financing , 1973 .
[10] Suresh Kumar Goyal,et al. A one-vendor multi-buyer integrated inventory model: A comment , 1995 .
[11] Mohamad Y. Jaber,et al. Coordinating a two-level supply chain with delay in payments and profit sharing , 2006, Comput. Ind. Eng..
[12] Powell E. Robinson,et al. Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research , 2002, Decis. Sci..
[13] S. Aggarwal,et al. Ordering Policies of Deteriorating Items under Permissible Delay in Payments , 1995 .
[14] Diwakar Gupta,et al. A Stochastic Inventory Model with Trade Credit , 2009, Manuf. Serv. Oper. Manag..
[15] Ralf W. Seifert,et al. A review of trade credit literature: Opportunities for research in operations , 2013, Eur. J. Oper. Res..
[16] Z. Balkhi. OPTIMAL ECONOMIC ORDERING POLICY WITH DETERIORATING ITEMS UNDER DIFFERENT SUPPLIER TRADE CREDITS FOR FINITE HORIZON CASE , 2011 .
[17] S. Goyal. Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .
[18] Jinn-Tsair Teng,et al. Inventory lot-Size Models under Trade Credits: a Review , 2008, Asia Pac. J. Oper. Res..
[19] Salem M. Aljazzar,et al. Coordination of a two-level supply chain (manufacturer–retailer) with permissible delay in payments , 2016 .
[20] Jianwen Luo,et al. Buyer–vendor inventory coordination with credit period incentives , 2007 .
[21] Napsiah Ismail,et al. An EPQ Inventory Model with Allowable Shortages for Deteriorating Items under Trade Credit Policy , 2014 .
[22] C. Jaggi,et al. A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive , 2003 .
[23] Kenneth Njoroge,et al. The Implicit Costs of Trade Credit Borrowing by Large Firms , 2013 .
[24] S. Viswanathan,et al. Coordinating supply chain inventories through common replenishment epochs , 2001, Eur. J. Oper. Res..
[25] S. Zolfaghari,et al. Quantitative Models for Centralised Supply Chain Coordination , 2008 .
[26] Hau L. Lee,et al. The bullwhip effect in supply chains , 2015, IEEE Engineering Management Review.
[27] Lu Lu. A one-vendor multi-buyer integrated inventory model , 1995 .
[28] Mohamad Y. Jaber,et al. Coordinating a three-level supply chain with delay in payments and a discounted interest rate , 2014, Comput. Ind. Eng..
[29] Napsiah Ismail,et al. Reviewing the Literature of Inventory Models under Trade Credit Contact , 2014 .
[30] Mohamad Y. Jaber,et al. Lot sizing with permissible delay in payments and entropy cost , 2007, Comput. Ind. Eng..
[31] Kun-Jen Chung,et al. THE OPTIMAL ORDERING POLICY IN A DCF ANALYSIS FOR DETERIORATING ITEMS WHEN TRADE CREDIT DEPENDS ON THE ORDER QUANTITY , 2006 .
[32] S. Seuring,et al. Sustainable supply chain management and inter-organizational resources: a literature review , 2009 .
[33] Mohamad Y. Jaber,et al. A joint model for cash and inventory management for a retailer under delay in payments , 2013, Comput. Ind. Eng..
[34] Eric Sucky,et al. The bullwhip effect in supply chains—An overestimated problem? , 2009 .
[35] M. Jaber,et al. Coordinating a three-level supply chain with learning-based continuous improvement , 2010 .
[36] Liang-Hsuan Chen,et al. Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments , 2007, Eur. J. Oper. Res..
[37] Jim Freeman,et al. Inventory Control and Management , 1992 .