Tratamento de esgotos sanitários em sistemas reatores UASB/wetlands construídas de fluxo horizontal: eficiência e estabilidade de remoção de matéria orgânica, sólidos, nutrientes e coliformes

This work presented the results of a 19-month study on the performance of constructed wetlands in terms of organic matter, solids, nutrients and coliforms removal in pilot scale unities with horizontal, subsurface and surface flow, with hydraulic retention time from 1.3 to 5.3 days, as post-treatment of UASB effluents (domestic wastewater). Organic matter and solids were effectively and consistently removed, with average values of 70, 80 and 60% for TSS, BOD5 and COD, respectively. Nutrients removal, after a promising start up, became unstable and apparently influenced by temperature. The treatment system has also shown high potential to remove coliforms, although with relatively wide variations over the study period: ≈ 2 log10 reduction of total coliforms and 2-4 log10 reduction of Escherichia coli.

[1]  E. Luis,et al.  Removal of wastewater pathogen indicators in a constructed wetland in Leon, Spain , 2008 .

[2]  K. R. Reddy,et al.  Nutrient management in agricultural watersheds: A wetlands solution , 2005 .

[3]  J. Sousa,et al.  Utilização de wetland construído no pós-tratamento de esgotos domésticos pré-tratados em reator UASB , 2004 .

[4]  J. Vymazal Removal of Phosphorus in Constructed Wetlands with Horizontal Sub-Surface Flow in the Czech Republic , 2004 .

[5]  Charles P Gerba,et al.  The persistence and removal of enteric pathogens in constructed wetlands. , 2004, Water research.

[6]  D. D. Mara,et al.  Parasite removal by natural wastewater treatment systems: performance of waste stabilisation ponds and constructed wetlands. , 2003, Water science and technology : a journal of the International Association on Water Pollution Research.

[7]  Mark S. Coyne,et al.  Vegetation effects on fecal bacteria, BOD, and suspended solid removal in constructed wetlands treating domestic wastewater , 2003 .

[8]  K. E. Foster,et al.  Fate of indicator microorganisms, Giardia and Cryptosporidium in subsurface flow constructed wetlands. , 2001, Water research.

[9]  J.J.A. van Bruggen,et al.  Combination of a Well Functioning Constructed Wetland with a Pleasing Landscape Design in Nairobi, Kenya , 1999 .

[10]  C. Polprasert,et al.  Kinetics of Fecal Coliform Removal in Constructed Wetlands , 1999 .

[11]  C. Tanner,et al.  Substratum Phosphorus Accumulation during Maturation of Gravel-bed Constructed Wetlands , 1999 .

[12]  C. Polprasert,et al.  Role of plant uptake on nitrogen removal in constructed wetlands located in the tropics , 1997 .

[13]  J. Vymazal Constructed wetlands for wastewater treatment in the Czech Republic the first 5 years experience , 1996 .

[14]  Alan Warren,et al.  Removal of pathogens from wastewaters by the root zone method (RZM) , 1995 .

[15]  Hans Brix,et al.  Functions of Macrophytes in Constructed Wetlands , 1994 .

[16]  B. E. Hamouri,et al.  High-rate algal pond performances in faecal coliforms and helminth egg removals , 1994 .