Precast Structures in Regions of High Seismicity: 1997 UBC Design Provisions
暂无分享,去创建一个
The 1997 edition of the Uniform Building Code, for the first time, contains design provisions for precast concrete structures located in regions of high seismicity (Seismic Zones 3 and 4). This paper provides background and discussion of the new code provisions, along with a design example illustrating the provisions.
[1] Michael Hafner,et al. Connections Between Precast Elements—Failure Within Connection Region , 1989 .
[2] Mohammad R. Ehsani,et al. MOMENT RESISTANT CONNECTIONS IN PRECAST CONCRETE FRAMES FOR SEISMIC REGIONS , 1993 .
[3] M. J. N. Priestley,et al. Seismic tests of precast beam-to-column joint subassemblages with unbonded tendons , 1996 .