A New Heuristic for Disassembly Line Balancing Problems with AND/OR Precedence Relations
暂无分享,去创建一个
Rajeev Jain | P. K. Mishra | Shwetank Avikal | Harish Yadav | R. Jain | H. Yadav | P. Mishra | S. Avikal
[1] Yixiong Feng,et al. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .
[2] Levent Kandiller,et al. Profit-oriented disassembly-line balancing , 2008 .
[3] Surendra M. Gupta,et al. Combinatorial optimization methods for disassembly line balancing , 2004, SPIE Optics East.
[4] Ihsan Sabuncuoglu,et al. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .
[5] Surendra M. Gupta,et al. 2-opt heuristic for the disassembly line balancing problem , 2004, SPIE Optics East.
[6] Surendra M. Gupta,et al. Disassembly line balancing. , 2007 .
[7] Rahul Rai,et al. A Petri Net based approach to determine the disassembly strategy of a product , 2002 .
[8] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[9] Tsai C. Kuo,et al. Environmentally conscious design and manufacturing: A state-of-the-art survey , 1997 .
[10] Surendra M. Gupta,et al. A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..
[11] Surendra M. Gupta,et al. Disassembly line in product recovery , 2002 .