Integrated scheduling of rolling sector in steel production with consideration of energy consumption under time-of-use electricity prices

Abstract Due to increasing load and penetration of renewables, the electric grid is using time-of-use pricing for industrial customers. Involving energy-intensive processes, steel companies can reduce their production cost by accounting for changes in electricity pricing. In particular, steel companies can take advantage of processing flexibility to make better use of electric power, and thus reduce the energy cost. In this paper, we address a new integrated scheduling problem of multi-stage production derived from the rolling sector of steel production, with consideration of campaign decisions and demand-side management. The problem is formulated as a continuous time mixed-integer nonlinear programming (MINLP) model with generalized disjunctive programming (GDP) constraints, which is then reformulated as a mixed-integer linear programming (MILP) model. Numerical results are presented to demonstrate that the model is computationally efficient and compact.

[1]  Pedro M. Castro,et al.  Scope for industrial applications of production scheduling models and solution methods , 2014, Comput. Chem. Eng..

[2]  Iiro Harjunkoski,et al.  Continuous-time Batch Scheduling Approach for Optimizing Electricity Consumption Cost , 2013 .

[3]  I. Grossmann,et al.  New continuous-time scheduling formulation for continuous plants under variable electricity cost , 2009 .

[4]  Dario Pacciarelli,et al.  Production scheduling in a steelmaking-continuous casting plant , 2004, Comput. Chem. Eng..

[5]  Ignacio E. Grossmann,et al.  Optimization of steel production scheduling with complex time-sensitive electricity cost , 2015, Comput. Chem. Eng..

[6]  Pedro M. Castro,et al.  Optimal scheduling of continuous plants with energy constraints , 2011, Comput. Chem. Eng..

[7]  Manfred Morari,et al.  Electrical load tracking scheduling of a steel plant , 2010, Comput. Chem. Eng..

[8]  F. Glover IMPROVED LINEAR INTEGER PROGRAMMING FORMULATIONS OF NONLINEAR INTEGER PROBLEMS , 1975 .

[9]  C. Floudas,et al.  Production Scheduling of a Large-Scale Steelmaking Continuous Casting Process via Unit-Specific Event-Based Continuous-Time Models: Short-Term and Medium-Term Scheduling , 2012 .

[10]  Ignacio E. Grossmann,et al.  Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines , 2008, Comput. Chem. Eng..

[11]  Pedro M. Castro,et al.  Optimal maintenance scheduling of a gas engine power plant using generalized disjunctive programming , 2014 .

[12]  R. Raman,et al.  Modelling and computational techniques for logic based integer programming , 1994 .

[13]  J. M. Pinto,et al.  Optimal cyclic scheduling of multistage continuous multiproduct plants , 1994 .

[14]  I. Grossmann,et al.  A decomposition approach for the scheduling of a steel plant production , 2001 .

[15]  Christodoulos A. Floudas,et al.  Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review , 2004, Comput. Chem. Eng..

[16]  Lixin Tang,et al.  A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex , 2000, Eur. J. Oper. Res..

[17]  Iiro Harjunkoski,et al.  Resource–Task Network Formulations for Industrial Demand Side Management of a Steel Plant , 2013 .

[18]  Ignacio E. Grossmann,et al.  An Alternate MILP Model for Short-Term Scheduling of Batch Plants with Preordering Constraints , 1996 .

[19]  Jaime Cerdá,et al.  State-of-the-art review of optimization methods for short-term scheduling of batch processes , 2006, Comput. Chem. Eng..

[20]  Gabriela Hug,et al.  Cost-Effective Scheduling of Steel Plants With Flexible EAFs , 2017, IEEE Transactions on Smart Grid.

[21]  Ignacio E. Grossmann,et al.  Generalized Convex Disjunctive Programming: Nonlinear Convex Hull Relaxation , 2003, Comput. Optim. Appl..

[22]  Ignacio E. Grossmann,et al.  Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes , 2012, Comput. Chem. Eng..

[23]  J. M. Pinto,et al.  A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch Plants , 1995 .

[24]  Pedro M. Castro,et al.  Generalized Disjunctive Programming as a Systematic Modeling Framework to Derive Scheduling Formulations , 2012 .

[25]  Christos T. Maravelias,et al.  Integration of production planning and scheduling: Overview, challenges and opportunities , 2009, Comput. Chem. Eng..

[26]  Lixin Tang,et al.  A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..