Significant Causes and Effects of Project Delays in the Niger Delta Region, Nigeria

Social infrastructure and amenities are crucial to creating sustainable communities. The Niger Delta region has been severely deprived by a lack of basic social amenities. In 2009, the Niger Delta Regional Development Master Plan (NDRDMP) was launched to ensure well-coordinated developmental programmes. Implementation of the master plan is expected to be completed within fifteen years at a cost of over USD 36,000,000. The continuous rise in the inflation rate in Nigeria would increase the cost of implementing the master plan, if the projects are not completed on scheduled time. Although most of these social amenities projects ‘construction works began over the past years, their completion times have, however, been pushed back beyond the stipulated completion durations. Additionally, delays in infrastructural projects could impede oil exploration and cause negative impacts on the socio-economic activities of the Nigerian state. This, therefore, poses serious concern to the developmental partners in the region. This study investigates the major causes and effects of construction project delays in the Niger Delta Region.

[1]  Amiruddin Ismail,et al.  Identification of Success Factors in Minimizing Delays on Construction Projects in IAU - Shoushtar Branch - Iran , 2011 .

[2]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[3]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[4]  Chi-Cheng Yang,et al.  Evaluating schedule delay causes for private participating public construction works under the Build-Operate-Transfer model , 2010 .

[5]  James E. Bartlett,et al.  Organizational research: Determining appropriate sample size in survey research , 2001 .

[6]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[7]  Ibnu Abbas Majid Causes and effect of delays in Aceh construction industry , 2006 .

[8]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[9]  A. A. Olatunji,et al.  Influences on construction project delivery time , 2010 .

[10]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[11]  William G. Cochran,et al.  Sampling Techniques, 3rd Edition , 1963 .

[12]  Abdul Aziz Abdullah,et al.  APPLICATION OF PROJECT MANAGEMENT METHODS IN THE CONSTRUCTION OF BUNGALOW HOUSE PROJECT: A CASE STUDY IN KUALA TERENGGANU, MALAYSIA , 2011 .

[13]  M. M. Dlakwa,et al.  Reasons for overrun in public sector construction projects in Nigeria , 1990 .

[14]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[15]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[17]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[18]  A. F. Caletka,et al.  Delay analysis in construction contracts , 2008 .

[19]  João Pedro Almeida Couto,et al.  The public institutions performance is one of main Portuguese construction reasons for delays , 2010 .