Recent Success Stories on Optimization of Railway Systems
暂无分享,去创建一个
Leonardo Lamorgese | Carlo Mannino | Ralf Borndörfer | Markus Reuther | Thomas Schlechte | Torsten Klug | C. Mannino | M. Reuther | Torsten Klug | Leonardo Lamorgese | Ralf Borndörfer | Thomas Schlechte
[1] Matthias Ehrgott,et al. Multicriteria Optimization (2. ed.) , 2005 .
[2] Ravindra K. Ahuja,et al. Integer programming based solution approaches for the train dispatching problem , 2010 .
[3] Martin Wohl,et al. Notes on transient queuing behavior, capacity restraint functions, and their relationship to travel forecasting , 1968 .
[4] Markus Reuther. Local Search for the Resource Constrained Assignment Problem , 2014, ATMOS.
[5] Martin Grötschel,et al. Planning Problems in Public Transit , 2010 .
[6] Rolf H. Möhring,et al. Traffic Networks and Flows over Time , 2009, Algorithmics of Large and Complex Networks.
[7] Miguel A. Salido,et al. An Assessment of Railway Capacity , 2008 .
[8] Lucas P. Veelenturf,et al. An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .
[9] Abraham Charnes,et al. A MODEL FOR THE OPTIMAL PROGRAMMING OF RAILWAY FREIGHT TRAIN MOVEMENTS , 1956 .
[10] Leonardo Lamorgese,et al. Optimal Train Dispatching by Benders'-Like Reformulation , 2016, Transp. Sci..
[11] Matthias Ehrgott,et al. Multicriteria Optimization , 2005 .
[12] Ralf Borndörfer,et al. The hypergraph assignment problem , 2015, Discret. Optim..
[13] Ralf Borndörfer,et al. Vehicle Rotation Planning for Intercity Railways , 2012 .
[14] Gabrio Curzio Caimi. Train Scheduling in a Large and Highly Utilised Railway Network , 2010, OR.
[15] Ralf Borndörfer,et al. Re-Optimization of Rolling Stock Rotations , 2013, OR.
[16] Armin Fügenschuh,et al. Mixed-Integer Nonlinear Problems in Transportation Applications , 2010 .
[17] Johannes Lieberherr,et al. Capacity-restraint railway transport assignment at SBB- Passenger , 2012 .
[18] C. Mannino. 14 Real-Time Traffic Control in Mass Transit and Railway Transport 11 , 2011 .
[19] Ralf Borndörfer,et al. Konrad-zuse-zentrum Für Informationstechnik Berlin a Hypergraph Model for Railway Vehicle Rotation Planning a Hypergraph Model for Railway Vehicle Rotation Planning * , 2022 .
[20] Armin Fügenschuh,et al. The Freight Train Routing Problem , 2013 .
[21] Paolo Toth,et al. Scheduling extra freight trains on railway networks , 2010 .
[22] Markus Montigel. Operations Control System in the Lotschberg Base Tunnel , 2009 .
[23] Alexander Schrijver,et al. On the history of the transportation and maximum flow problems , 2002, Math. Program..
[24] N A Irwin,et al. Capacity restraint in multi-travel mode assignment programs , 1962 .
[25] Ralf Borndörfer,et al. A Coarse-To-Fine Approach to the Railway Rolling Stock Rotation Problem , 2014, ATMOS.
[26] Leonardo Lamorgese,et al. An Exact Decomposition Approach for the Real-Time Train Dispatching Problem , 2015, Oper. Res..
[27] Carlo Mannino,et al. Optimal Real-Time Traffic Control in Metro Stations , 2009, Oper. Res..
[28] Matthias Ehrgott,et al. Railway track allocation: models and methods , 2011, OR Spectr..
[29] Paola Pellegrini,et al. Optimal train routing and scheduling for managing traffic perturbations in complex junctions , 2014 .
[30] Thomas Schlechte,et al. Railway Track Allocation: Models and Algorithms , 2012 .
[31] Anita Schöbel,et al. Line planning in public transportation: models and methods , 2012, OR Spectr..
[32] Paolo Toth,et al. Nominal and robust train timetabling problems , 2012, Eur. J. Oper. Res..
[33] Ralf Borndörfer,et al. Integrated Optimization of Rolling Stock Rotations for Intercity Railways , 2016, Transp. Sci..