Resource-Constrained Project Scheduling of Cloud Platform Based on Column Generation Algorithm

[1]  Andreas T. Ernst,et al.  Lagrangian Particle Swarm Optimization for a resource constrained machine scheduling problem , 2012, 2012 IEEE Congress on Evolutionary Computation.

[2]  Junfeng Chen,et al.  Optimizing Sensor Ontology Alignment through Compact co-Firefly Algorithm , 2020, Sensors.

[3]  Gaurav Singh,et al.  A multi-agent system for decentralised fractional shared resource constraint scheduling , 2011, Web Intell. Agent Syst..

[4]  Madjid Tavana,et al.  A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems , 2014, Expert Syst. Appl..

[5]  Xingsi Xue,et al.  A Compact Brain Storm Algorithm for Matching Ontologies , 2020, IEEE Access.

[6]  Giuseppe Confessore,et al.  A market-based multi-agent system model for decentralized multi-project scheduling , 2007, Ann. Oper. Res..

[7]  Jayendran Venkateswaran,et al.  Decentralised decision-making in a multi-party supply chain , 2016 .

[8]  Changchun Liu,et al.  A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem , 2018, Comput. Ind. Eng..

[9]  Xingsi Xue,et al.  A compact firefly algorithm for matching biomedical ontologies , 2020, Knowledge and Information Systems.

[10]  Andreas T. Ernst,et al.  Resource constraint scheduling with a fractional shared resource , 2011, Oper. Res. Lett..

[11]  T. C. Edwin Cheng,et al.  Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs , 2006, Theor. Comput. Sci..

[12]  Gijs J. M. Krijnen,et al.  Development of Soft sEMG Sensing Structures Using 3D-Printing Technologies , 2020, Sensors.

[13]  Yuehwern Yih,et al.  An agent-based production control framework for multiple-line collaborative manufacturing , 2001, International Journal of Production Research.

[14]  Gaurav Singh,et al.  A resource constrained scheduling problem with multiple independent producers and a single linking constraint: A coal supply chain example , 2014, Eur. J. Oper. Res..

[15]  Fabian Castaño,et al.  A column generation approach to extend lifetime in wireless sensor networks with coverage and connectivity constraints , 2014, Comput. Oper. Res..

[16]  Changfeng Ma,et al.  A modified CG algorithm for solving generalized coupled Sylvester tensor equations , 2020, Appl. Math. Comput..