Lot Streaming Procedures for the Flow Shop

[1]  Chris N. Potts,et al.  Flow shop scheduling with lot streaming , 1989 .

[2]  Kenneth R. Baker,et al.  A comparative study of lot streaming procedures , 1993 .

[3]  S. Goyal Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model” , 1976 .

[4]  David F. Pyke,et al.  Solution Procedures for the Lot‐Streaming Problem , 1990 .

[5]  A. Buss,et al.  Lot Splitting in Stochastic Flow Shop and Job Shop Environments , 1996 .

[6]  Chris N. Potts,et al.  Structural Properties of Lot Streaming in a Flow Shop , 1998, Math. Oper. Res..

[7]  Huan Neng Chiu,et al.  A comprehensive review of lot streaming , 2005 .

[8]  Alper Sen,et al.  Optimal streaming of a single job in a two-stage flow shop , 1998, Eur. J. Oper. Res..

[9]  Dan Trietsch Optimal transfer lots for batch manufacturing: A basic case and extensions , 1987 .

[10]  Dan Triesch,et al.  Polynomial Transfer Lot Sizing Techniques for Batch Processing on Consecutive Machines , 1989 .

[11]  Kenneth R. Baker,et al.  Basic Techniques for Lot Streaming , 1993, Oper. Res..

[12]  Jiang Chen,et al.  Lot streaming with attached setups in three-machine flow shops , 1997 .

[13]  A. Z. Szendrovits Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .

[14]  Kenneth R. Baker,et al.  Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..

[15]  Chris N. Potts,et al.  Lot streaming in three-stage production processes , 1994 .

[16]  William G. Truscott,et al.  Scheduling production activities in multi-stage batch manufacturing systems , 1985 .