Operational Decisions in AGV-Served Flowshop Loops: Fleet Sizing and Decomposition
暂无分享,去创建一个
Chelliah Sriskandarajah | Nicholas G. Hall | Tharmarajah Ganesharajah | C. Sriskandarajah | Tharmarajah Ganesharajah
[1] Chelliah Sriskandarajah,et al. Operational Decisions in AGV-Served Flowshop Loops: Scheduling , 2001, Ann. Oper. Res..
[2] Chelliah Sriskandarajah,et al. Scheduling in Robotic Cells: Heuristics and Cell Design , 1999, Oper. Res..
[3] Yavuz A. Bozer,et al. Tandem configurations for AGV systems offer simplicity and flexibility , 1989 .
[4] Gerd Finke,et al. Scheduling tasks and vehicles in a flexible manufacturing system , 1991 .
[5] Yogeswaran Theivanayagam,et al. Design of automated guided vehicle systems using Petri net models , 1996 .
[6] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[7] Gerd Finke,et al. Vehicle scheduling in two-cycle flexible manufacturing systems , 1994 .
[8] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .
[9] D. L. Kimbler,et al. Assignement of AGVS with different vehicle types , 1987 .
[10] Margaret L. Brandeau,et al. Designing Multiple-Load Automated Guided Vehicle Systems for Delivering Material from a Central Depot , 1995 .
[11] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[12] James T. Lin,et al. A load-routeing problem in a tandem-configuration automated guided-vehicle system , 1994 .
[13] Panagiotis Kouvelis,et al. Unidirectional Loop Network Layout Problem in Automated Manufacturing Systems , 1992, Oper. Res..
[14] Toshihide Ibaraki,et al. Automated Two-machine Flowshop Scheduling: A Solvable Case , 1991 .
[15] A. Kusiak,et al. An expert system for design of automated Material Handling Systems (INSIMAS) , 1985 .
[16] Valerio Grasso,et al. AGV-served assembly lines: influence of sequencing and launch policies on system performances , 1990 .
[17] Yavuz A. Bozer,et al. Tandem Configurations for Automated Guided Vehicle Systems and the Analysis of Single Vehicle Loops , 1991 .
[18] Chelliah Sriskandarajah,et al. Scheduling in robotic cells: Complexity and steady state analysis , 1998, Eur. J. Oper. Res..
[19] Yavuz A. Bozer,et al. Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems , 1992 .
[20] James T. Lin,et al. An algorithm for routeing control of a tandem automated guided vehicle system , 1994 .
[21] Andrew Kusiak,et al. Design of components for schedulability , 1994 .
[22] Mufit Ozden,et al. A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system , 1988 .
[23] H.-P. B. Wang,et al. Performance evaluation of tandem and conventional AGV systems using generalized stochastic Petri nets , 1994 .
[24] John B. Kidd,et al. Toyota Production System , 1993 .
[25] Robert J. Wittrock,et al. Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..
[26] S. S. Panwalkar,et al. Scheduling of a Two-machine Flowshop with Travel Time Between Machines , 1991 .
[27] Andrew Kusiak,et al. Concurrent Engineering: Automation, Tools, and Techniques , 1992 .
[28] Helman I. Stern,et al. Scheduling Parts in a Combined Production-transportation Work Cell , 1990 .
[29] Jim Lee,et al. Traditional and Tandem AGV System Layouts: A Simulation Study , 1994, Simul..
[30] Chelliah Sriskandarajah,et al. Scheduling in Robotic Cells: Classification, Two and Three Machine Cells , 1997, Oper. Res..
[31] Robert W. Hall,et al. Cyclic scheduling for improvement , 1988 .
[32] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[33] Chelliah Sriskandarajah,et al. Design and operational issues in AGV-served manufacturing systems , 1998, Ann. Oper. Res..