Multi-objective flexible flow lines with due window, time lag, and job rejection
暂无分享,去创建一个
[1] Dong Cao,et al. Parallel machine selection and job scheduling to minimize machine cost and job tardiness , 2005, Comput. Oper. Res..
[2] Jorge M. S. Valente,et al. An exact approach to early/tardy scheduling with release dates , 2005, Comput. Oper. Res..
[3] Valerie Botta-Genoulaz,et al. Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness , 2000 .
[4] Rubén Ruiz,et al. The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..
[5] Mitsuo Gen,et al. Genetic algorithms and engineering optimization , 1999 .
[6] John J. Kanet,et al. Single-machine scheduling with early and tardy completion costs , 1993 .
[7] Shixin Liu,et al. Order-planning model and algorithm for manufacturing steel sheets , 2006 .
[8] Virginie Gabrel,et al. Scheduling jobs within time windows on identical parallel machines: New model and algorithms , 1995 .
[9] C. Rajendran. Heuristics for scheduling in flowshop with multiple objectives , 1995 .
[10] M. Zandieh,et al. Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers , 2012 .
[11] Seyyed M. T. Fatemi Ghomi,et al. Production , Manufacturing and Logistics A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains , 2006 .
[12] Jan Riezebos,et al. Time lag size in multiple operations flow shop scheduling heuristics , 1998, Eur. J. Oper. Res..
[13] Sebastián Lozano,et al. A Genetic Algorithm for Solving a Production and Delivery Scheduling Problem with Time Windows , 2002, IBERAMIA.
[14] Edy Bertolissi,et al. Heuristic algorithm for scheduling in the no-wait flow-shop , 2000 .
[15] Fariborz Jolai,et al. A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection , 2009 .
[16] Chelliah Sriskandarajah,et al. Performance of scheduling algorithms for no-wait flowshops with parallel machines , 1988 .
[17] Ammar Oulamara,et al. Permutation flowshop scheduling problems with maximal and minimal time lags , 2006, Comput. Oper. Res..
[18] R. L. Daniels,et al. Multiobjective flow-shop scheduling , 1990 .
[19] T. C. Edwin Cheng,et al. Two-stage flowshop earliness and tardiness machine scheduling involving a common due window , 2004 .
[20] John L. Hunsucker,et al. A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage , 2004, Eur. J. Oper. Res..
[21] Józef Grabowski,et al. Sequencing of jobs in some production system , 2000, Eur. J. Oper. Res..
[22] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[23] Ameur Soukhal,et al. Complexity of flow shop scheduling problems with transportation constraints , 2005, Eur. J. Oper. Res..
[24] Tariq A. Aldowaisan,et al. NEW HEURISTICS FOR M-MACHINE NO-WAIT FLOWSHOP TO MINIMIZE TOTAL COMPLETION TIME , 2004 .
[25] Chelliah Sriskandarajah,et al. A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups , 2000, Oper. Res. Lett..
[26] Liang Gao,et al. Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects , 2011 .
[27] Sebastián Lozano,et al. Production and delivery scheduling problem with time windows , 2005, Comput. Ind. Eng..
[28] Nabeel Qassim,et al. Department of Industrial Engineering , 2014 .
[29] Leo Kroon,et al. Exact and approximation algorithms for the operational fixed interval scheduling problem , 1995 .
[30] Hamid Davoudpour,et al. Solving multi-objective SDST flexible flow shop using GRASP algorithm , 2009 .