Lean engineering logistics: load leveling of design jobs with capacity considerations
暂无分享,去创建一个
[1] Tomaso Poggio,et al. Learning to see , 1996 .
[2] P. Schroeder. The Goal: A Process of Ongoing Improvement , 1994 .
[3] Marcello Braglia,et al. A new value stream mapping approach for complex production systems , 2006 .
[4] Harrison H. Owen,et al. Open Space Technology: A User's Guide , 1993 .
[5] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[6] Daniel Sipper,et al. Production: Planning, Control and Integration , 1997 .
[7] Bohdan W. Oppenheim,et al. Lean product development flow , 2004, Syst. Eng..
[8] C. van Koten,et al. Bayesian statistical effort prediction models for data-centred 4GL software development , 2006, Inf. Softw. Technol..
[9] Joseph R. Wirthlin. Best Practices in User Needs/ Requirements Generation , 2000 .
[10] Hamdi A. Bashir,et al. Estimating design effort for GE hydro projects , 2004, Comput. Ind. Eng..
[11] J. Cutcher-Gershenfeld,et al. Lean Thinking , 2019, Encyclopedia of Sustainable Management.
[12] David Taylor. Value chain analysis: an approach to supply chain improvement in agri‐food chains , 2005 .
[13] Hugh McManus. Product Development Value Stream Mapping (PDVSM) Manual Release 1.0 , 2005 .
[14] Hugh McManus,et al. Lean Engineering: Doing the Right Thing Right , 2005 .
[15] Myles Alexander Walton. Identifying the impact of modeling and simulation in the generation of system level requirements , 1999 .
[16] A. Posner. Learning to see. , 1955, Eye, ear, nose & throat monthly.
[17] P. Chan,et al. Strategic Employee Scheduling , 2006 .