Planning production on a single processor with sequence-dependent setups part 1: determination of campaigns

[1]  Earl E. Bomberger,et al.  A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .

[2]  Frederick S. Hillier,et al.  Introduction of Operations Research , 1967 .

[3]  S. Fujita The Application of Marginal Analysis to the Economic Lot Scheduling Problem , 1978 .

[4]  R. Meyer Two-Segment Separable Programming , 1979 .

[5]  R. W. Haessler An Improved Extended Basic Period Procedure for Solving the Economic Lot Scheduling Problem , 1979 .

[6]  Gregory Dobson,et al.  The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..

[7]  Harpal Singh,et al.  Production Scheduling with Sequence Dependent Setup Costs , 1987 .

[8]  David Kendrick,et al.  GAMS, a user's guide , 1988, SGNM.

[9]  Gregory Dobson The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups , 1992, Oper. Res..

[10]  G. Reklaitis,et al.  HEURISTIC ALGORITHM FOR SCHEDULING BATCH AND SEMI-CONTINUOUS PLANTS WITH PRODUCTION DEADLINES, INTERMEDIATE STORAGE LIMITATIONS AND EQUIPMENT CHANGEOVER COSTS , 1994 .

[11]  Luis Puigjaner,et al.  Global strategy for energy and waste analysis in scheduling and planning of multiproduct batch chemical processes , 1996 .

[12]  Costas D. Maranas,et al.  Multiperiod Planning and Scheduling of Multiproduct Batch Plants under Demand Uncertainty , 1997 .

[13]  Luis Puigjaner,et al.  Batch production and preventive maintenance scheduling under equipment failure uncertainty , 1997 .

[14]  Iftekhar A. Karimi,et al.  Planning and scheduling of parallel semicontinuous processes. 1. Production planning , 1997 .

[15]  I. Karimi,et al.  Planning and Scheduling of Parallel Semicontinuous Processes. 2. Short-Term Scheduling , 1997 .

[16]  I. Grossmann,et al.  A Mixed-Integer Linear Programming Model for Short-Term Scheduling of Single-Stage Multiproduct Batch Plants with Parallel Lines , 1997 .

[17]  Serge Domenech,et al.  A two-stage methodology for short-term batch plant scheduling , 1998 .

[18]  I. Grossmann,et al.  Cyclic scheduling of continuous parallel‐process units with decaying performance , 1998 .