Full Closure or Partial Closure? Evaluation of Construction Plans for the I-5 Closure in Downtown Sacramento

Three alternative construction plans with full highway closures and limited capacity closures (partial closures) are evaluated for a large-scale freeway reconstruction project in the Sacramento metropolitan area. By using a dynamic network analysis tool, the potential impact resulting from different construction plans is estimated and analyzed measured by changes in total demand, travel delays, vehicle miles/hours traveled (VMT/VHT), fuel consumptions, and emissions. The results show that, for this Interstate 5 closure, if only user delay costs are considered, the actual full closure plan is the best. It produces considerably less total system travel delay than the two partial closure plans although it closed more lanes. This plan, however, may induce more VMT than the other two. In fact, the other two partial closure plans produce slightly fewer emissions and consume slightly less fuel. The outcome of which plan comes out on top crucially depends on two other factors, besides the chosen objective: the amount of demand reduction a plan induces and the availability of alternative routes to divert traffic away from the work zone area. Developing efficient demand management measures will be the key to improving the network performance and to reduce the emissions. Moreover, when data are available, construction costs and emissions produced by construction activities should also be included in the evaluations, in addition to the user costs considered in this study.

[1]  Alexandra Kondyli,et al.  Estimation of Freeway Work Zone Capacity through Simulation and Field Data , 2009 .

[2]  P. I. Richards Shock Waves on the Highway , 1956 .

[3]  Indrajit Chatterjee,et al.  Replication of Work Zone Capacity Values in a Simulation Model , 2009 .

[4]  Zhen Qian,et al.  A Hybrid Route Choice Model for Dynamic Traffic Assignment , 2012, Networks and Spatial Economics.

[5]  Michael D Fontaine,et al.  Guidelines for Using Late Merge Traffic Control in Work Zones: Results of a Simulation-Based Study , 2005 .

[6]  Michael D Fontaine,et al.  Interaction between System Design and Operations of Variable Speed Limit Systems in Work Zones , 2010 .

[7]  M. Lighthill,et al.  On kinematic waves I. Flood movement in long rivers , 1955, Proceedings of the Royal Society of London. Series A. Mathematical and Physical Sciences.

[8]  John Collura,et al.  Simulation Models for Assessment of the Impacts of Strategies for Highway Work Zones , 2010 .

[9]  Nagui M. Rouphail,et al.  Estimating Operational Impacts of Freeway Work Zones on Extended Facilities , 2010 .

[10]  Zhen Qian,et al.  What Happens When a Major Freeway is Closed for Repair? , 2012 .

[11]  Stacy Cagle Davis,et al.  Transportation energy data book , 2008 .

[12]  C. Daganzo THE CELL TRANSMISSION MODEL.. , 1994 .

[13]  Will Davis,et al.  QuickZone Improvement for Rural Freeway and Model Validation , 2009 .

[14]  M J Lighthill,et al.  On kinematic waves II. A theory of traffic flow on long crowded roads , 1955, Proceedings of the Royal Society of London. Series A. Mathematical and Physical Sciences.

[15]  M J Lighthill,et al.  ON KINEMATIC WAVES.. , 1955 .