Full Closure or Partial Closure? Evaluation of Construction Plans for the I-5 Closure in Downtown Sacramento
暂无分享,去创建一个
[1] Alexandra Kondyli,et al. Estimation of Freeway Work Zone Capacity through Simulation and Field Data , 2009 .
[2] P. I. Richards. Shock Waves on the Highway , 1956 .
[3] Indrajit Chatterjee,et al. Replication of Work Zone Capacity Values in a Simulation Model , 2009 .
[4] Zhen Qian,et al. A Hybrid Route Choice Model for Dynamic Traffic Assignment , 2012, Networks and Spatial Economics.
[5] Michael D Fontaine,et al. Guidelines for Using Late Merge Traffic Control in Work Zones: Results of a Simulation-Based Study , 2005 .
[6] Michael D Fontaine,et al. Interaction between System Design and Operations of Variable Speed Limit Systems in Work Zones , 2010 .
[7] M. Lighthill,et al. On kinematic waves I. Flood movement in long rivers , 1955, Proceedings of the Royal Society of London. Series A. Mathematical and Physical Sciences.
[8] John Collura,et al. Simulation Models for Assessment of the Impacts of Strategies for Highway Work Zones , 2010 .
[9] Nagui M. Rouphail,et al. Estimating Operational Impacts of Freeway Work Zones on Extended Facilities , 2010 .
[10] Zhen Qian,et al. What Happens When a Major Freeway is Closed for Repair? , 2012 .
[11] Stacy Cagle Davis,et al. Transportation energy data book , 2008 .
[12] C. Daganzo. THE CELL TRANSMISSION MODEL.. , 1994 .
[13] Will Davis,et al. QuickZone Improvement for Rural Freeway and Model Validation , 2009 .
[14] M J Lighthill,et al. On kinematic waves II. A theory of traffic flow on long crowded roads , 1955, Proceedings of the Royal Society of London. Series A. Mathematical and Physical Sciences.
[15] M J Lighthill,et al. ON KINEMATIC WAVES.. , 1955 .