An Optimization-Based Decision Support System for Strategic and Operational Planning in Process Industries

We describe how a generic multi-period optimization-based decision support system can be used for strategic and operational planning in process industries. Built on five fundamental elements—materials, facilities, activities, time periods and storage areas—this system requires little direct knowledge of optimization techniques to be used effectively. Results based on real data from an American integrated steel company demonstrate significant potential for improvement in revenues and profits.

[1]  Tibor Fabian,et al.  A Linear Programming Model of Integrated Iron and Steel Production , 1958 .

[2]  Friedrich Wilhelm Bielefeld,et al.  A Computer-Based Strategic Planning System for Steel Production , 1986 .

[3]  Arthur M. Geoffrion Computer-Based Modeling Environments , 1989 .

[4]  Goutam Dutta,et al.  A Survey of Mathematical Programming Applications in Integrated Steel Plants , 2001, Manuf. Serv. Oper. Manag..

[5]  Gopal P. Sinha,et al.  A linear programming model for distribution of electrical energy in a steel plant , 1994 .

[6]  Robert Fourer,et al.  Database structures for mathematical programming models , 1997, Decis. Support Syst..

[7]  Lixin Tang,et al.  A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..

[8]  Roy E. Marsten,et al.  The Design of the XMP Linear Programming Library , 1981, TOMS.

[9]  Gopal P. Sinha,et al.  Strategic and Operational Management with Optimization at Tata Steel , 1995 .

[10]  Hong Li,et al.  Integrated model for production planning in a large iron and steel manufacturing environment , 2001 .

[11]  R. Bandyopadhyay Open-Hearth and Basic-Oxygen Furnaces: An Allocation Model for Production Planning , 1969, IEEE Trans. Syst. Sci. Cybern..

[12]  Xiaoli Li,et al.  Real-time tool wear condition monitoring in turning , 2001 .

[13]  Michael R. Bussieck,et al.  Optimal scrap combination for steel production , 1998 .

[14]  Peter I. Cowling,et al.  Integration of continuous caster and hot strip mill planning for steel production , 2000 .

[15]  Mingyuan Chen,et al.  A linear programming model for integrated steel production and distribution planning , 1997 .

[16]  E. M. L. Beale,et al.  Separable Programming Applied to an Ore Purchasing Problem , 1965 .

[17]  Lixin Tang,et al.  A mathematical programming model for scheduling steelmaking-continuous casting production , 2000, Eur. J. Oper. Res..