Research in automated measurement of project performance indicators

Abstract Current monitoring and control methods rely on massive manual work. As a result, control information is expensive to produce, or is generated irregularly. Additionally, the information is only available infrequently — in many cases after the controlled activity was completed — and its quality and integrity are low. The purpose of the research presented in this paper is to improve monitoring and control information, i.e. to offer it on a daily basis, to improve its quality and integrity and to reduce the cost of generating it. To do all this, the Technion APPC researchers started exploring the use of automated data collection (ADC) technologies. We developed models for automated labor and equipment control, materials management and control as well as monitoring safety measures — all described in this paper. Based on the above, the paper discusses development issues and the prospects for commercializing such systems. Materials management and control is currently the most practical application. On the other end of the spectrum is labor control, which currently is the most challenging area.

[1]  O. Kolton,et al.  Model for Automated Monitoring of Fall Hazards in Building Construction , 2006 .

[2]  Chi Sun Poon,et al.  Reducing building waste at construction sites in Hong Kong , 2004 .

[3]  Ronie Navon,et al.  Development and On-Site Evaluation of an Automated Materials Management and Control Model , 2005 .

[4]  Makarand Hastak,et al.  Material Control System for the Manufactured Housing Industry , 2005 .

[5]  Charles M. Eastman,et al.  Building Product Models: Computer Environments, Supporting Design and Construction , 1999 .

[6]  Aminah Robinson Fayek,et al.  Automated Corrective Action Selection Assistant , 1994 .

[7]  Edward J. Jaselskis,et al.  Implementing Radio Frequency Identification in the Construction Process , 2003 .

[8]  Kincho H. Law,et al.  Building Design Services in a Distributed Architecture , 1999 .

[9]  Annette L. Stumpf,et al.  Construction Daily Log Management System Using Multimedia Technology , 1995 .

[10]  Bo‐Christer Björk,et al.  A formalised model of the information and materials handling activities in the construction process , 2002 .

[11]  François Peyret,et al.  The computer Integrated Road construction project , 2000 .

[12]  Ronie Navon,et al.  FIELD EXPERIMENTS IN AUTOMATED MONITORING OF ROAD CONSTRUCTION , 2005 .

[13]  Ronie Navon An Overview of Automated Project Performance Control Research at the Technion , 2005 .

[14]  Govindan Kannan,et al.  DEVELOPMENT OF AN EXPERIENCE DATABASE FOR TRUCK LOADING OPERATIONS , 2000 .

[15]  Geraldine S. Cheok,et al.  Performance evaluation facility for ladars , 2004, SPIE Defense + Commercial Sensing.

[16]  Akintola Akintoye,et al.  Just-in-Time application and implementation for building material management , 1995 .

[17]  François Peyret,et al.  A Traceability System between Plant and Work Site for Asphalt Pavements , 2004 .

[18]  Cliff Schexnayder,et al.  Probability Distribution Functions for Construction Simulation , 2000 .

[19]  Lansford C. Bell,et al.  Costs and benefits of materials management systems , 1987 .

[20]  François Peyret,et al.  High-precision application of GPS in the field of real-time equipment positioning , 2000 .

[21]  Mustafa Alshawi,et al.  Distributed Object Environment: Using International Standards for Data Exchange in the Construction Industry , 1999 .

[22]  Carlos Torres Formoso,et al.  Improving the materials supply system in small-sized building firms , 1999 .

[23]  Iris D. Tommelein,et al.  WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .

[24]  Amr A. Oloufa,et al.  Situational awareness of construction equipment using GPS, wireless and web technologies , 2003 .

[25]  Ben J Hicks,et al.  SPIE - The International Society for Optical Engineering , 2001 .

[26]  Erez N. Allouche,et al.  PHOTO-NET II: a computer-based monitoring system applied to project management , 2003 .

[27]  Min-Yuan Cheng,et al.  Integrating barcode and GIS for monitoring construction progress , 2002 .

[28]  Sai On Cheung,et al.  PPMS: a Web-based construction Project Performance Monitoring System , 2004 .

[29]  Y. Wu,et al.  Digital Imaging in Assessment of Construction Project Progress , 2004 .

[30]  Alan D. Russell Computerized Daily Site Reporting , 1993 .

[31]  Peter E.D. Love,et al.  An application of the Internet-based project management system , 2001 .

[32]  Lucio Soibelman,et al.  Material Waste in Building Industry: Main Causes and Prevention , 2002 .

[33]  Ronie Navon,et al.  AN INFORMATION SHARING, INTERNET-BASED, SYSTEM FOR PROJECT CONTROL , 1999 .

[34]  Wenzhong Shi,et al.  Internet-based geographical information systems system for e-commerce application in construction material procurement , 2003 .

[35]  Han-Soo Kim,et al.  An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects , 2004 .

[36]  Ronie Navon,et al.  Can Labor Inputs be Measured and Controlled Automatically , 2003 .

[37]  Ronie Navon,et al.  Monitoring labor inputs: automated-data-collection model and enabling technologies , 2003 .

[38]  Diego Echeverry,et al.  Bar-code Control of Construction Field Personnel and Construction Materials , 1997 .

[39]  R. Edward Minchin,et al.  Validation of Vibration-Based Onboard Asphalt Density Measuring System , 2003 .

[40]  Ian Davidson,et al.  Simulation of Automated Data Collection in Buildings , 1995 .

[41]  Tatsuo Arai,et al.  Parts and packets unification radio frequency identification (RFID) application for construction , 2005 .

[42]  Zhen Chen,et al.  An application of bar-code system for reducing construction wastes , 2002 .

[43]  Burcu Akinci,et al.  Utilizing Radio-Frequency Identification on Precast Concrete Components - Supplier's Perspective , 2002 .

[44]  H. Randolph Thomas,et al.  Role of the Fabricator in Labor Productivity , 2000 .

[45]  B. Silverman Density estimation for statistics and data analysis , 1986 .

[46]  Alan M. Lytle,et al.  Report of the NIST Workshop on Data Exchange Standards at the Construction Job Site , 2003 .

[47]  Joshua J. Millspaugh,et al.  Effects of sample size on kernel home range estimates , 1999 .

[48]  Jimmie Hinze,et al.  The Nature of Struck-by Accidents , 2005 .