The evaluation and justification of the effectiveness of 4D CAD using multi-criteria analysis
暂无分享,去创建一个
Leonas Ustinovichius | Romas Rasiulis | Ruta Simanaviciene | Marius Reizgevičius | Mykolas Pelikša | L. Ustinovichius | Marius Reizgevičius | R. Rasiulis | R. Simanavičienė | M. Pelikša
[1] Nashwan Dawood,et al. Measuring the effectiveness of 4D planning as a valuable communication tool , 2008, J. Inf. Technol. Constr..
[2] Qing Fan,et al. Building information modelling (BIM) for sustainable building design , 2013 .
[3] Leonas Ustinovichius,et al. A Model for Solving Structural, Technological and Safety Problems , 2012 .
[4] Qing Zhu,et al. Design and implementation of 3D model database for general-purpose 3D GIS , 2010, Geo spatial Inf. Sci..
[5] Jian-Ping Zhang,et al. Application of 4D for dynamic site layout and management of construction projects , 2005 .
[6] K. Chau,et al. D Dynamic Management for Construction Planning and Resource Utilization * , 2009 .
[7] Sheryl Staub-French,et al. Visualizing high-rise building construction strategies using linear scheduling and 4D CAD , 2009 .
[8] Lieyun Ding,et al. Application of 4D visualization technology for safety management in metro construction , 2013 .
[9] Burcu Akinci,et al. Automated generation of workspace requirements of mobile crane operations to support conflict detection , 2007 .
[10] Jian-Ping Zhang,et al. 4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .
[11] Valentinas Podvezko,et al. The Comparative Analysis of MCDA Methods SAW and COPRAS , 2011 .
[12] Changyoon Kim,et al. 4D CAD model updating using image processing-based construction progress monitoring , 2013 .
[13] Hyoun-Seok Moon,et al. Development of a 4D object-based system for visualizing the risk information of construction projects , 2013 .
[14] T. Olofsson,et al. A method for planning of workflow by combined use of location-based scheduling and 4 D CAD , 2006 .
[15] Tao Cheng,et al. Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications , 2013 .
[16] Frédéric Bosché,et al. Automated progress tracking using 4D schedule and 3D sensing technologies , 2012 .
[17] Sisi Zlatanova,et al. Solutions for 4D cadastre – with a case study on utility networks , 2011, Int. J. Geogr. Inf. Sci..
[18] Kihong Ku,et al. BIM Experiences and Expectations: The Constructors' Perspective , 2011 .
[19] E. Zavadskas,et al. Multi-criteria Optimization System for Decision Making in Construction Design and Management , 2009 .
[20] Darius Migilinskas,et al. Computer-Aided Modelling, Evaluation and Management of Construction Projects According to PLM Concept , 2006, CDVE.
[21] Darius Migilinskas,et al. Methodology of Risk and Uncertainty Management in Construction’s Technological and Economical Problems , 2008 .
[22] Jian-Ping Zhang,et al. 4D dynamic construction management and visualization software: 1. Development , 2005 .
[23] Rahul Kashyap,et al. An evaluation of the applicability of 4D CAD on construction projects , 2010 .
[24] Darius Migilinskas,et al. The use of a virtual building design and construction model for developing an effective project concept in 5D environment , 2010 .
[25] Rogier Jongeling,et al. A method for planning of work-flow by combined use of location-based scheduling and 4D CAD , 2007 .