Energy-aware Economic Production Quantity model with variable energy pricing
暂无分享,去创建一个
[1] John W. Sutherland,et al. A New Shop Scheduling Approach in Support of Sustainable Manufacturing , 2011 .
[2] Xiang Ling,et al. Bi-objective optimization for single-machine batch scheduling considering energy cost , 2014, 2014 International Conference on Control, Decision and Information Technologies (CoDIT).
[3] Biswajit Sarkar,et al. An inventory model with reliability in an imperfect production process , 2012, Appl. Math. Comput..
[4] Mohamed Ben-Daya,et al. Economic production quantity model with a shifting production rate , 2008, Int. Trans. Oper. Res..
[5] Kit-Nam Francis Leung,et al. A generalized geometric-programming solution to "An economic production quantity model with flexibility and reliability considerations" , 2007, Eur. J. Oper. Res..
[6] Hao Zhang,et al. Manufacturing Scheduling for Energy Cost Reduction in a Smart Grid Scenario , 2014 .
[7] Damien Trentesaux,et al. Energy-aware manufacturing operations , 2015 .
[8] Shib Sankar Sana,et al. A production-inventory model of imperfect quality products in a three-layer supply chain , 2011, Decis. Support Syst..
[9] S. Singh,et al. An economic production lot-size (EPLS) model with rework and flexibility under allowable shortages , 2012 .
[10] Nita H. Shah,et al. EPQ model for returned/reworked inventories during imperfect production process under price-sensitive stock-dependent demand , 2018, Oper. Res..
[11] Yongxin Su,et al. Economic batch sizing and scheduling on parallel machines under time-of-use electricity pricing , 2018, Oper. Res..
[12] Hao Zhang,et al. Energy-conscious flow shop scheduling under time-of-use electricity tariffs , 2014 .
[13] Sami Kara,et al. Renewable energy integration into factories: Real-time control of on-site energy systems , 2015 .
[14] Shib Sankar Sana,et al. An economic production lot size model in an imperfect production system , 2010, Eur. J. Oper. Res..
[15] Xiangtong Qi,et al. Scheduling with variable time slot costs , 2010 .
[16] A. Isaksson,et al. Scheduling and energy - Industrial challenges and opportunities , 2015, Comput. Chem. Eng..
[17] Bibhas Chandra Giri,et al. Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks , 2014, Oper. Res..
[18] Mehmet Bayram Yildirim,et al. Sustainable single-machine scheduling problem with reliability and energy consumption , 2011 .
[19] Mehmet Bayram Yildirim,et al. Single-Machine Sustainable Production Planning to Minimize Total Energy Consumption and Total Completion Time Using a Multiple Objective Genetic Algorithm , 2012, IEEE Transactions on Engineering Management.
[20] Mehmet Bayram Yildirim,et al. Integrated maintenance and production planning with energy consumption and minimal repair , 2014 .
[21] Xiaoling Sun,et al. Nonlinear Integer Programming , 2006 .