Integrating a cost reduction delivery policy into an imperfect production system with repairable items

This paper integrates a cost reduction delivery policy into an imperfect production system with repairable items for the purpose of lowering producer’s stock holding cost. The present paper reexamines a manufacturing lot-size problem studied by a prior paper, and improves its production batch size solution in terms of lowering its inventory holding cost. An n+ 1 delivery policy is proposed here in lieu of n multi-delivery plan used by the prior paper. Under such a policy, an initial (additional) installment of finished products is shipped to customer within the production uptime for satisfying product demand during producer’s regular production and rework times. Fixed quantity n installments of finished items are then distributed to customer at a fixed interval of time, at the end of rework. Mathematical modeling and analyses are employed in this study. As a result, the optimal replenishment lot size solution is derived. A numerical example is provided to show its practical usage as well as its significant savings in stock holding cost.

[1]  Singa Wang Chiu,et al.  Optimal production lot sizing with rework, scrap rate, and service level constraint , 2007, Math. Comput. Model..

[2]  Udo Buscher,et al.  Optimizing a production system with rework and equal sized batch shipments , 2007, Comput. Oper. Res..

[3]  Ki Ling Cheung,et al.  Joint determination of preventive maintenance and safety stocks in an unreliable production environment , 1997 .

[4]  A. Gunasekaran,et al.  Determination of economic production quantity in a multi-stage production system , 1994 .

[5]  Nukman Yusoff,et al.  Impacts of Common Components on Production System in an Uncertain Environment , 2009 .

[6]  Singa Wang Chiu,et al.  Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown , 2009 .

[7]  Bong Jin Yum,et al.  Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .

[8]  Singa Wang Chiu,et al.  Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method , 2006 .

[9]  Frederick S. Hillier,et al.  Introduction of Operations Research , 1967 .

[10]  Soo Y. Chang,et al.  Optimal production run length and inspection schedules in a deteriorating production process , 2001 .

[11]  Ruhul A. Sarker,et al.  An optimal batch size for a production system operating under periodic delivery policy , 1999 .

[12]  Leroy B. Schwarz,et al.  A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem , 1973 .

[13]  Yigal Gerchak,et al.  Multistage Production to Order with Rework Capability , 2002, Manag. Sci..

[14]  Ikou Kaku,et al.  The scheduling of deliveries in a production-distribution system with multiple buyers , 2008, Ann. Oper. Res..

[15]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[16]  Singa Wang Chiu,et al.  Robust planning in optimization for production system subject to random machine breakdown and failure in rework , 2010, Comput. Oper. Res..

[17]  Ruhul A. Sarker,et al.  An optimal batch size under a periodic delivery policy , 2001, Int. J. Syst. Sci..

[18]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[19]  Fassil Nebebe,et al.  Determination of economic production-shipment policy for a single-vendor-single-buyer system , 2000, Eur. J. Oper. Res..

[20]  L. B. Schwarz,et al.  Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System , 1985 .

[21]  Anton Abdulbasah Kamil,et al.  Analysis of inventory-production systems with Weibull distributed deterioration , 2009 .

[22]  Seung-Lae Kim,et al.  Production and delivery policies for enhanced supply chain partnerships , 2008 .

[23]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[24]  Singa Wang Chiu,et al.  Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .

[25]  Bhaba R. Sarker,et al.  Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries , 2006, Comput. Oper. Res..

[26]  Soo Y. Chang,et al.  Optimal production run length and inspection schedules in a deteriorating production process , 2001 .

[27]  W. Shih Optimal inventory policies when stockouts result from defective products , 1980 .

[28]  Bhaba R. Sarker,et al.  Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers , 2009, Eur. J. Oper. Res..

[29]  S. Viswanathan,et al.  Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..

[30]  Viliam Makis Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .

[31]  Xin Zhang,et al.  Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .

[32]  Bhaba R. Sarker,et al.  An optimal batch size for a production system operating under a just-in-time delivery system , 1993 .

[33]  Steven Nahmias,et al.  Production and operations analysis , 1992 .

[34]  M. Bayrak,et al.  Effects of power quality on manufacturing costs in textile industry , 2009 .

[35]  Singa Wang Chiu,et al.  Mathematical modeling for production system with backlogging and failure in repair , 2006 .

[36]  M. A. Wazed,et al.  Impacts of quality and processing time uncertainties in multistage production system , 2010 .