Sustainability-Oriented Project Scheduling Based on Z-Fuzzy Numbers for Public Institutions
暂无分享,去创建一个
[1] M. Sakawa,et al. Max-min solutions for fuzzy multiobjective matrix games , 1994 .
[2] Víctor Blanco,et al. Eco-friendly Materials for a New Concept of Asphalt Pavement , 2016 .
[3] Cengiz Kahraman,et al. Spherical fuzzy sets and spherical fuzzy TOPSIS method , 2019, J. Intell. Fuzzy Syst..
[4] Rafik A. Aliev,et al. An introduction to the arithmetic of Z-numbers by using horizontal membership functions , 2017 .
[5] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[7] P. Rosasco,et al. Infrastructures and Sustainability: An Estimation Model for a New Highway Near Genoa , 2020, Sustainability.
[8] M. Martinsuo,et al. Sustainable project management through project control in infrastructure projects , 2017 .
[9] Francisco Ballestín,et al. Scheduling projects with limited number of preemptions , 2009, Comput. Oper. Res..
[10] Mehrdad Javadi,et al. A New Evaluation for Solving the Fully Fuzzy Data Envelopment Analysis with Z-Numbers , 2018, Symmetry.
[11] Charinee Limsawasd,et al. Pre-project Planning Process Study of Green Building Construction Projects in Thailand , 2019 .
[12] Rui Zhang. Sustainable Scheduling of Cloth Production Processes by Multi-Objective Genetic Algorithm with Tabu-Enhanced Local Search , 2017 .
[13] Yi Zhang. Construction of Bid Evaluation Index System in Government Public Project Green Procurement in China Based on D-S Evidence Theory , 2020, Sustainability.
[15] Qi Liu,et al. Green Project Planning with Realistic Multi-Objective Consideration in Developing Sustainable Port , 2018, Sustainability.
[16] Víctor Yepes,et al. Assessing the social sustainability contribution of an infrastructure project under conditions of uncertainty , 2017 .
[17] Li Ma,et al. Energy Utilization Evaluation of Carbon Performance in Public Projects by FAHP and Cloud Model , 2016 .
[18] Ahmed Senouci,et al. Time Delay and Cost Overrun in Qatari Public Construction Projects , 2016 .
[19] Wenzhu Liao,et al. A Novel Collaborative Optimization Model for Job Shop Production–Delivery Considering Time Window and Carbon Emission , 2019, Sustainability.
[20] Fang-wei Zhu,et al. Integrating Sustainability into Construction Engineering Projects: Perspective of Sustainable Project Planning , 2018, Journal of Development and Social Sciences.
[21] Seyed Hessameddin Zegordi,et al. A multi-objective optimization approach to project scheduling with resiliency criteria under uncertain activity duration , 2020, Ann. Oper. Res..
[22] Dan Rusu,et al. The Organizational Culture in Public and Private Institutions , 2015 .
[23] Chao Zhang,et al. Energy-Efficient Scheduling for a Job Shop Using Grey Wolf Optimization Algorithm with Double-Searching Mode , 2018, Mathematical Problems in Engineering.
[24] Richard F. Deckro,et al. Resource constrained project crashing , 1989 .
[25] Stanisław Gasik,et al. Are Public Projects Different than Projects in other Sectors? Preliminary Results of Empirical Research , 2016, CENTERIS/ProjMAN/HCist.
[26] M. Skitmore,et al. Prioritizing the Sustainability Objectives of Major Public Projects in the Guangdong–Hong Kong–Macao Greater Bay Area , 2018, Sustainability.
[27] Nor Hanimah Kamis,et al. A Z-number-based decision making procedure with ranking fuzzy numbers method , 2014 .
[28] Marly Monteiro de Carvalho,et al. Can project sustainability management impact project success? An empirical study applying a contingent approach , 2017 .
[29] Lotfi A. Zadeh,et al. A Note on Z-numbers , 2011, Inf. Sci..
[30] M. Stiglbauer. STRATEGIC STAKEHOLDER MANAGEMENT BY CORPORATE SOCIAL RESPONSIBILITY: SOME CONCEPTUAL THOUGHTS , 2011 .
[31] Gro Holst Volden. Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway. , 2018, Evaluation and program planning.